Amedee Geothermal Venture I

Brownfield

Amedee, Lassen, California · Hays Ranches, LLC

Legacy capacity
3
MW

Amedee Geothermal Venture I is a former geothermal site in Amedee, Lassen, California, retired 2014-11-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 3 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer geothermal site
Site typeretired_plant
Existing capacity3 MW
Retirement date2014-11-01
EIA plant ID#50964

Grid hookup & remediation

Nearest substation4.7 mi
Operator addressUS 395 at Road A3, Amedee, CA, 96127
Why this site is datacenter-attractive: a former geothermal site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Lassen County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)3,697
Construction employment167
Land value$4,493/acre

Power economics & interconnection

Commercial power rate24.15¢/kWh
Industrial power rate18.96¢/kWh
Load growth (FERC-714)1.3%

Water & cooling

Water stressHigh
Public water supply3.8 MGD
Industrial water use0.0 MGD
Cooling degree days1,000
Mean annual temp59°F

Hazard, flood & connectivity

FEMA risk index48.0 · Relatively High
Fiber providers4 · 50% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Get alerts

Track Amedee Geothermal Venture I

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Amedee Geothermal Venture I, ranked by DC Readiness.

Candidate sites near Amedee Geothermal Venture I
SiteTypeStateCountyVoltageCapacityQueue waitScore
FORT SAGESubstation-AdjacentNVSierra County345 kV600 MW6.9 yrs53.2
Amedee Geothermal Venture IBrownfieldNVWashoe County69 kV3 MW5.7 yrs46.7
AMDEESubstation-AdjacentCALassen County69 kV50 MW8.2 yrs43.6
WINEAGLESubstation-AdjacentCALassen County69 kV50 MW8.2 yrs43.6
US ORD DEPOT-HERLONGSubstation-AdjacentCALassen County69 kV50 MW8.2 yrs43.6
UNKNOWN306122Substation-AdjacentCAPlumas County69 kV50 MW8.2 yrs43.2
PATTONSubstation-AdjacentCAPlumas County69 kV50 MW8.2 yrs43.0
HERLONGSubstation-AdjacentCAPlumas County69 kV50 MW8.2 yrs43.0

See all datacenter sites in California →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

Every site and score for Amedee Geothermal Venture I, Amedee, Lassen, California is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.