Skip to content
Gridcensus

Tri Cities

Brownfield

Phoenix, Maricopa, Arizona · Salt River Project

Legacy capacity
5
MW

Tri Cities is a natural gas plant in Phoenix, Maricopa, Arizona, retired 2015-07-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 5 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former usenatural gas plant
Site typeretired_plant
Existing capacity5 MW
Retirement date2015-07-01
EIA plant ID#7998

Grid hookup & remediation

Nearest substation1.2 mi
Operator addressP.O. Box 52025 PAB 221, Phoenix, AZ, 85072
Why this site is datacenter-attractive: a natural gas plant of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Nearby datacenter candidate sites

Scored candidate sites near Tri Cities, ranked by DC Readiness.

Candidate sites near Tri Cities
SiteTypeStateCountyVoltageCapacityQueue waitScore
Copper Crossing Energy and Research CentBrownfieldAZPinal County69 kV1,779 MW5.7 yrs67.6
BROWNINGSubstation-AdjacentAZPinal County500 kV1,000 MW6.9 yrs64.6
KYRENESubstation-AdjacentAZMaricopa County500 kV1,000 MW6.9 yrs64.2
PINNACLE PEAK APSSubstation-AdjacentAZMaricopa County500 kV1,000 MW6.9 yrs63.1
Williams Air Force BaseBrownfieldAZMaricopa69 kV2 MW6.9 yrs62.2
WARDSubstation-AdjacentAZMaricopa County230 kV300 MW6.9 yrs61.5
EC Near CrosscutGreenfieldAZMaricopa5.7 yrs60.9
OZ MaricopaGreenfieldAZMaricopa5.7 yrs60.6

Nearby internet exchanges

See all datacenter sites in Arizona

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Tri Cities, Phoenix, Maricopa, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.