Irving

Brownfield

Camp Verde, Yavapai, Arizona · Arizona Public Service Co

Legacy capacity
2
MW

Irving is a former hydro site in Camp Verde, Yavapai, Arizona, retired 2005-06-01. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 2 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer hydro site
Site typeretired_plant
Existing capacity2 MW
Retirement date2005-06-01
EIA plant ID#115

Grid hookup & remediation

Nearest substation19.6 mi
Operator addressFossil Creek Road, Camp Verde, AZ, 86322
Why this site is datacenter-attractive: a former hydro site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Site conditions & market — Yavapai County

County-level intelligence for this site's location — the power economics, water, hazard, connectivity, and workforce a developer screens before ever visiting. Assembled from FEMA NRI, BLS QCEW, FCC BDC, USGS water-use, and EIA.

Market & workforce

Total employment (laborshed)59,568
Construction employment5,837
Land value$2,325/acre
Datacenter tax incentiveproperty_tax_reduction

Power economics & interconnection

Commercial power rate13.18¢/kWh
Industrial power rate10.18¢/kWh
Load growth (FERC-714)2.0%

Water & cooling

Water stressExtremely High
Public water supply21.1 MGD
Industrial water use1.1 MGD
Cooling degree days3,400
Mean annual temp63°F

Hazard, flood & connectivity

FEMA risk index22.0 · Relatively Low
Fiber providers10 · 12% served

County-level context — address-level utility offerings and flood zoning vary within the county. Confirm site-specific service with the utility and a Phase I ESA.

Nearby brownfield & retired-generation sites

A proximity screen of other retired-plant, contaminated, and EPA-flagged sites near Irving — the environmental neighborhood, ranked by legacy grid capacity.

SiteFormer useLegacy MWDistanceCleanup status
Childsformer hydro site55.9 mi—

Derived from GridCensus's retired-generator & EPA brownfield dataset. Not a substitute for an ASTM E1527 Phase I environmental radius report.

Get alerts

Track Irving

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Irving, ranked by DC Readiness.

Candidate sites near Irving
SiteTypeStateCountyVoltageCapacityQueue waitScore
MAZATZALSubstation-AdjacentAZGila County345 kV600 MW6.9 yrs53.8
OZ YavapaiGreenfieldAZYavapai——5.7 yrs52.7
UNKNOWN301553Substation-AdjacentAZYavapai County69 kV50 MW6.9 yrs49.1
IrvingBrownfieldAZYavapai County—2 MW5.7 yrs45.8
Cottonwood Foursquare ChurchIndustrialAZYavapai County——6.9 yrs45.3
Friendship Mission (Tax Lot 045H)IndustrialAZYavapai County——6.9 yrs45.3
ChildsBrownfieldAZYavapai County—5 MW5.7 yrs44.9
Mine SiteFormer MineAZYavapai County——6.9 yrs44.8

See all datacenter sites in Arizona →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Irving, Camp Verde, Yavapai, Arizona. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.