Ajo Solar Project
BrownfieldAjo, Arizona
Ajo Solar Project is a former mine site in Ajo, Arizona. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 5 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.
Former use & capacity
Grid hookup & remediation
Get alerts
Track Ajo Solar Project
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Nearby datacenter candidate sites
Scored candidate sites near Ajo Solar Project, ranked by DC Readiness.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TAP310962 | Substation-Adjacent | AZ | Pima County | 230 kV | 300 MW | 6.9 yrs | 55.8 |
| Ajo Solar Project | Brownfield | AZ | Pima | 14 kV | 5 MW | 6.9 yrs | 54.1 |
| TAP310933 | Substation-Adjacent | AZ | Pima County | 69 kV | 50 MW | 6.9 yrs | 49.6 |
| TAP310932 | Substation-Adjacent | AZ | Pima County | 69 kV | 50 MW | 6.9 yrs | 49.5 |
| Curley School | Industrial | AZ | Pima County | — | — | 6.9 yrs | 45.6 |
| 100 Estrella | Industrial | AZ | Pima County | — | — | 6.9 yrs | 45.6 |
| Plaza Triangle Park | Industrial | AZ | Pima County | — | — | 6.9 yrs | 45.6 |
| Curley School Gymnasium | Industrial | AZ | Pima County | — | — | 6.9 yrs | 45.6 |
See all datacenter sites in Arizona →
Dataset updated . Screening estimates derived from public data sources.
Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Ajo Solar Project, Ajo, Arizona. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.