Ajo Solar Project

Brownfield

Ajo, Arizona

Legacy capacity
5
MW

Ajo Solar Project is a former mine site in Ajo, Arizona. Retired generation sites are among the most attractive datacenter redevelopment targets: the existing interconnection was sized for roughly 5 MW of generation, so the grid hookup, transmission rights, and often cooling-water access are already in place — collapsing the speed-to-power timeline versus a greenfield build.

Former use & capacity

Former useformer mine site
Site typeepa_brownfield
Existing capacity5 MW
Acreage38 ac

Grid hookup & remediation

Nearest substation2.0 mi
Cleanup statuscleanup_complete
Why this site is datacenter-attractive: a former mine site of this scale leaves behind a high-capacity grid interconnection that a new load can re-use, frequently shaving years off the interconnection queue. Retired-plant sites also tend to be already zoned for heavy industrial use with established road, rail, and water infrastructure.

Get alerts

Track Ajo Solar Project

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Nearby datacenter candidate sites

Scored candidate sites near Ajo Solar Project, ranked by DC Readiness.

Candidate sites near Ajo Solar Project
SiteTypeStateCountyVoltageCapacityQueue waitScore
TAP310962Substation-AdjacentAZPima County230 kV300 MW6.9 yrs55.8
Ajo Solar ProjectBrownfieldAZPima14 kV5 MW6.9 yrs54.1
TAP310933Substation-AdjacentAZPima County69 kV50 MW6.9 yrs49.6
TAP310932Substation-AdjacentAZPima County69 kV50 MW6.9 yrs49.5
Curley SchoolIndustrialAZPima County——6.9 yrs45.6
100 EstrellaIndustrialAZPima County——6.9 yrs45.6
Plaza Triangle ParkIndustrialAZPima County——6.9 yrs45.6
Curley School GymnasiumIndustrialAZPima County——6.9 yrs45.6

See all datacenter sites in Arizona →

Dataset updated . Screening estimates derived from public data sources.

Brownfield attributes are derived from EIA retired-generator and EPA public data. Existing capacity reflects the retired plant's historical nameplate, not deliverable interconnection for a new load. Confirm reusable interconnection rights, remediation status, and site availability with the utility, ISO, and current owner.