TAP144266 is an electric transmission substation in Wisconsin, on AMERICAN TRANSMISSION CO's transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #120394 | 138 kV | — | IN SERVICE | 1.8 mi |
| #122715 | 138 kV | — | IN SERVICE | 0.0 mi |
| #138524 | 138 kV | AMERICAN TRANSMISSION CO | IN SERVICE | 9.2 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP144266, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| CAROLINE | Substation-Adjacent | WI | Shawano County | 345 kV | 600 MW | 4.3 yrs | 63.1 |
| OZ Portage | Greenfield | WI | Portage | — | — | 4.3 yrs | 62.4 |
| WHITCOMB | Substation-Adjacent | WI | Shawano County | 345 kV | 600 MW | 4.3 yrs | 61.9 |
| UNKNOWN157838 | Substation-Adjacent | WI | Portage County | 115 kV | 100 MW | 4.3 yrs | 59.3 |
| EC Near Weston | Greenfield | WI | Marathon | — | — | 4.3 yrs | 58.8 |
| HOOVER | Substation-Adjacent | WI | Portage County | 138 kV | 100 MW | 4.3 yrs | 58.8 |
| ARNOTT | Substation-Adjacent | WI | Portage County | 138 kV | 100 MW | 4.3 yrs | 58.6 |
| WHITE LAKE | Substation-Adjacent | WI | Waupaca County | 138 kV | 100 MW | 4.3 yrs | 58.6 |
Who owns the transmission lines at TAP144266?
The 3 connected lines listed above are owned by AMERICAN TRANSMISSION CO. Line voltages range from 138 kV to 138 kV. Their combined recorded length is about 11 miles.
How do candidate sites near TAP144266 score?
The 8 highest-scoring candidate sites within about 25 miles range from 59 to 63 on the 0–100 DC Readiness scale. They fall in Shawano County, Portage, Portage County, Marathon. The Wisconsin average across 3,340 scored sites is 55.4. 1,248 of those Wisconsin sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP144266 substation?
TAP144266 has a maximum voltage of 138 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP144266 is above the national midpoint.
How many transmission lines connect to TAP144266 substation?
3 transmission lines terminate at or pass through TAP144266 in the HIFLD line data. The connected lines listed here run at 138 kV. Together the listed lines cover about 11 miles.
Who owns TAP144266 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP144266 belong to AMERICAN TRANSMISSION CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP144266 substation located?
TAP144266 is in Wisconsin at 44.4006, -89.1832. The datacenter candidate sites closest to it are in Shawano County, Portage, Portage County.
Are there datacenter candidate sites near TAP144266 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP144266. The highest-scoring is CAROLINE at 63/100. Across Wisconsin, the average DC Readiness score is 55.4.
More in Wisconsin
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP144266 substation, Wisconsin”, https://gridcensus.com/substations/wisconsin/tap144266-779868d2 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP144266 substation, Wisconsin is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.