At a glance

NECEDAH is a 69 kV electric substation in Wisconsin, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. 370 of Wisconsin's 768 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is Wisconsin Rapids Pulp Mill in Wood County, with a DC Readiness score of 62/100.

NECEDAH is an electric transmission substation in Wisconsin. It is classified as distribution (69–115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines1

Ownership

No owner is recorded for the lines that connect here.

Coordinates44.0249, -90.0595

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#15902669 kV—IN SERVICE1.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NECEDAH, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NECEDAH substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Wisconsin Rapids Pulp MillBrownfieldWIWood County—72 MW4.3 yrs61.7
FINNEGANSubstation-AdjacentWISauk County138 kV100 MW4.3 yrs61.0
EC Near JuneauGreenfieldWIJuneau——4.3 yrs60.8
TAP139562Substation-AdjacentWIWood County138 kV100 MW4.3 yrs60.5
PORT EDWARDSSubstation-AdjacentWIWood County138 kV100 MW4.3 yrs60.3
HOLLYWOODSubstation-AdjacentWIWood County138 kV100 MW4.3 yrs60.0
PETENWELLSubstation-AdjacentWIJuneau County138 kV100 MW4.3 yrs59.9
NORTHERN STEEL CASTINGSubstation-AdjacentWIWood County115 kV100 MW4.3 yrs59.9

How does NECEDAH compare with other substations in Wisconsin?

Wisconsin has 1,930 substation records in HIFLD, of which 768 carry a station name; the rest are unnamed tap points, risers and line ends. 340 named substations in the state are in NECEDAH's 69–114 kV band (44% of named stations). 370 sit in a higher band. 34 named substations in Wisconsin operate at 345 kV or above. The highest voltage recorded in the state is 345 kV, and the state median is 115 kV.

How do candidate sites near NECEDAH score?

The 8 highest-scoring candidate sites within about 25 miles range from 60 to 62 on the 0–100 DC Readiness scale. They fall in Wood County, Sauk County, Juneau, Juneau County. The Wisconsin average across 3,340 scored sites is 55.4. 1,248 of those Wisconsin sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is NECEDAH substation?

NECEDAH has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so NECEDAH is below the national midpoint.

How many transmission lines connect to NECEDAH substation?

1 transmission line terminate at or pass through NECEDAH in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 1.2 miles.

Where is NECEDAH substation located?

NECEDAH is in Wisconsin at 44.0249, -90.0595. The datacenter candidate sites closest to it are in Wood County, Sauk County, Juneau.

Are there datacenter candidate sites near NECEDAH substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of NECEDAH. The highest-scoring is Wisconsin Rapids Pulp Mill at 62/100. Across Wisconsin, the average DC Readiness score is 55.4.

Other 69 kV substations in Wisconsin

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “NECEDAH substation, Wisconsin”, https://gridcensus.com/substations/wisconsin/necedah-2c9177f7 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for NECEDAH substation, Wisconsin is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.