FEMRITE 138/69 KV

Substation

Wisconsin

Max voltage
—
kV

At a glance

FEMRITE 138/69 KV is an electric substation in Wisconsin, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. The highest-scoring datacenter candidate site within about 25 miles is CARDINAL in Dane County, with a DC Readiness score of 70/100.

FEMRITE 138/69 KV is an electric transmission substation in Wisconsin. It is classified as unclassified and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines1

Ownership

No owner is recorded for the lines that connect here.

Coordinates43.0507, -89.2819

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#166416——IN SERVICE0.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FEMRITE 138/69 KV, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FEMRITE 138/69 KV substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CARDINALSubstation-AdjacentWIDane County345 kV600 MW4.3 yrs69.6
NORTH MADISON 345/138KVSubstation-AdjacentWIDane County345 kV600 MW4.3 yrs67.7
CHRISTIANASubstation-AdjacentWIJefferson County345 kV600 MW4.3 yrs65.8
OZ DaneGreenfieldWIDane——4.3 yrs64.9
EC Near Blount StreetGreenfieldWIDane——4.3 yrs64.5
OZ DaneGreenfieldWIDane——4.3 yrs64.4
OZ DaneGreenfieldWIDane——4.3 yrs64.2
BLOUNTSubstation-AdjacentWIDane County138 kV100 MW4.3 yrs64.2

How do candidate sites near FEMRITE 138/69 KV score?

The 8 highest-scoring candidate sites within about 25 miles range from 64 to 70 on the 0–100 DC Readiness scale. They fall in Dane County, Jefferson County, Dane. The Wisconsin average across 3,340 scored sites is 55.4. 1,248 of those Wisconsin sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to FEMRITE 138/69 KV substation?

1 transmission line terminate at or pass through FEMRITE 138/69 KV in the HIFLD line data. Together the listed lines cover about 0.1 miles.

Where is FEMRITE 138/69 KV substation located?

FEMRITE 138/69 KV is in Wisconsin at 43.0507, -89.2819. The datacenter candidate sites closest to it are in Dane County, Jefferson County, Dane.

Are there datacenter candidate sites near FEMRITE 138/69 KV substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of FEMRITE 138/69 KV. The highest-scoring is CARDINAL at 70/100. Across Wisconsin, the average DC Readiness score is 55.4.

More in Wisconsin

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “FEMRITE 138/69 KV substation, Wisconsin”, https://gridcensus.com/substations/wisconsin/femrite-138-69-kv-46b45b39 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for FEMRITE 138/69 KV substation, Wisconsin is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.