Skip to content
Gridcensus

ACEC CALAMUS

Substation

Wisconsin · AMERICAN TRANSMISSION CO

Max voltage
69
kV

At a glance

ACEC CALAMUS is a 69 kV electric substation in Wisconsin on AMERICAN TRANSMISSION CO's transmission network, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. 370 of Wisconsin's 768 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is OZ Dane in Dane, with a DC Readiness score of 65/100.

ACEC CALAMUS is an electric transmission substation in Wisconsin, on AMERICAN TRANSMISSION CO's transmission network. It is classified as distribution (69–115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines1

Ownership

Line owner (most lines)AMERICAN TRANSMISSION CO
Coordinates43.4223, -88.9964

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16670169 kVAMERICAN TRANSMISSION COIN SERVICE6.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ACEC CALAMUS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ACEC CALAMUS substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ DaneGreenfieldWIDane——4.3 yrs64.9
EC Near Blount StreetGreenfieldWIDane——4.3 yrs64.5
OZ DaneGreenfieldWIDane——4.3 yrs64.2
BLOUNTSubstation-AdjacentWIDane County138 kV100 MW4.3 yrs64.2
FEMRITESubstation-AdjacentWIDane County138 kV100 MW4.3 yrs64.0
RISER163001Substation-AdjacentWIDane County138 kV100 MW4.3 yrs63.9
MCFARLANDSubstation-AdjacentWIDane County138 kV100 MW4.3 yrs63.8
SPRECHERSubstation-AdjacentWIDane County138 kV100 MW4.3 yrs63.7

How does ACEC CALAMUS compare with other substations in Wisconsin?

Wisconsin has 1,930 substation records in HIFLD, of which 768 carry a station name; the rest are unnamed tap points, risers and line ends. 340 named substations in the state are in ACEC CALAMUS's 69–114 kV band (44% of named stations). 370 sit in a higher band. 34 named substations in Wisconsin operate at 345 kV or above. The highest voltage recorded in the state is 345 kV, and the state median is 115 kV.

Who owns the transmission lines at ACEC CALAMUS?

The 1 connected line listed above is owned by AMERICAN TRANSMISSION CO. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 6 miles.

How do candidate sites near ACEC CALAMUS score?

The 8 highest-scoring candidate sites within about 25 miles range from 64 to 65 on the 0–100 DC Readiness scale. They fall in Dane, Dane County. The Wisconsin average across 3,340 scored sites is 55.4. 1,248 of those Wisconsin sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is ACEC CALAMUS substation?

ACEC CALAMUS has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so ACEC CALAMUS is below the national midpoint.

How many transmission lines connect to ACEC CALAMUS substation?

1 transmission line terminate at or pass through ACEC CALAMUS in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 6 miles.

Who owns ACEC CALAMUS substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at ACEC CALAMUS belong to AMERICAN TRANSMISSION CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is ACEC CALAMUS substation located?

ACEC CALAMUS is in Wisconsin at 43.4223, -88.9964. The datacenter candidate sites closest to it are in Dane, Dane County.

Are there datacenter candidate sites near ACEC CALAMUS substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of ACEC CALAMUS. The highest-scoring is OZ Dane at 65/100. Across Wisconsin, the average DC Readiness score is 55.4.

Other 69 kV substations in Wisconsin

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “ACEC CALAMUS substation, Wisconsin”, https://gridcensus.com/substations/wisconsin/acec-calamus-4fc4b439 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for ACEC CALAMUS substation, Wisconsin is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.