WYLIE RIDGE

Substation

West Virginia

Max voltage
500
kV

WYLIE RIDGE is an electric transmission substation in West Virginia. It is classified as extra-high-voltage (500 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage345 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines5

Ownership & operation

Operator not catalogued for this substation.

Coordinates40.4543, -80.5701

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WYLIE RIDGE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WYLIE RIDGE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WYLIE RIDGESubstation-AdjacentWVHancock County500 kV1,000 MW3.8 yrs68.0
EC Coal Allegheny CountyGreenfieldPAAllegheny County——3.0 yrs67.7
CRESCENTSubstation-AdjacentPABeaver County345 kV600 MW3.8 yrs65.6
CLINTONSubstation-AdjacentPABeaver County345 kV600 MW3.8 yrs65.3
EC Coal Allegheny CountyGreenfieldPAAllegheny County——3.0 yrs64.8
EC Coal Beaver CountyGreenfieldPABeaver County——3.0 yrs64.6
EC Coal Washington CountyGreenfieldPAWashington County——3.0 yrs64.2
UNKNOWN136871Substation-AdjacentOHHancock County345 kV600 MW3.8 yrs64.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for WYLIE RIDGE substation, West Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.