NEW HOPE (AP)

Substation

West Virginia · APPALACHIAN POWER CO

Max voltage
—
kV

At a glance

NEW HOPE (AP) is an electric substation in West Virginia on APPALACHIAN POWER CO's transmission network, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is OZ Mercer in Mercer, with a DC Readiness score of 60/100.

NEW HOPE (AP) is an electric transmission substation in West Virginia, on APPALACHIAN POWER CO's transmission network. It is classified as unclassified and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines2

Ownership

Line owner (most lines)APPALACHIAN POWER CO
Coordinates37.3537, -81.1522

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#108431—APPALACHIAN POWER COIN SERVICE2.9 mi
#121749—APPALACHIAN POWER COIN SERVICE7.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NEW HOPE (AP), ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NEW HOPE (AP) substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ MercerGreenfieldWVMercer——3.0 yrs60.3
EC Coal Mercer CountyGreenfieldWVMercer County——3.0 yrs59.7
EC Coal Raleigh CountyGreenfieldWVRaleigh County——3.0 yrs59.4
OZ MercerGreenfieldWVMercer——3.0 yrs58.1
CARSWELLSubstation-AdjacentWVMcDowell County138 kV100 MW3.0 yrs57.5
EC Coal McDowell CountyGreenfieldWVMcDowell County——3.0 yrs57.4
TAP154211Substation-AdjacentVAGiles County138 kV100 MW5.1 yrs57.4
STOTESBURYSubstation-AdjacentWVRaleigh County138 kV100 MW3.0 yrs57.0

Who owns the transmission lines at NEW HOPE (AP)?

The 2 connected lines listed above are owned by APPALACHIAN POWER CO. Their combined recorded length is about 10.4 miles.

How do candidate sites near NEW HOPE (AP) score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 60 on the 0–100 DC Readiness scale. They fall in Mercer, Mercer County, Raleigh County, McDowell County. The West Virginia average across 3,734 scored sites is 52. 378 of those West Virginia sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to NEW HOPE (AP) substation?

2 transmission lines terminate at or pass through NEW HOPE (AP) in the HIFLD line data. Together the listed lines cover about 10.4 miles.

Who owns NEW HOPE (AP) substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at NEW HOPE (AP) belong to APPALACHIAN POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is NEW HOPE (AP) substation located?

NEW HOPE (AP) is in West Virginia at 37.3537, -81.1522. The datacenter candidate sites closest to it are in Mercer, Mercer County, Raleigh County.

Are there datacenter candidate sites near NEW HOPE (AP) substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of NEW HOPE (AP). The highest-scoring is OZ Mercer at 60/100. Across West Virginia, the average DC Readiness score is 52.

More in West Virginia

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “NEW HOPE (AP) substation, West Virginia”, https://gridcensus.com/substations/west-virginia/new-hope-ap-b7aea9f8 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for NEW HOPE (AP) substation, West Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.