Skip to content
Gridcensus

TAP206249

Substation

Washington · AVISTA CORP

Max voltage
115
kV

At a glance

TAP206249 is a 115 kV electric substation in Washington on AVISTA CORP's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is GRAND COULEE 230KV in Douglas County, with a DC Readiness score of 64/100.

TAP206249 is an electric transmission substation in Washington, on AVISTA CORP's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

Line owner (most lines)AVISTA CORP
Coordinates47.7722, -118.6994

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#201135115 kVBONNEVILLE POWER ADMINISTRATION—10.6 mi
#205969115 kVAVISTA CORP—0.7 mi
#205970115 kVAVISTA CORP—4.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206249, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206249 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
GRAND COULEE 230KVSubstation-AdjacentWADouglas County500 kV1,000 MW3.5 yrs63.8
GRAND COULEE 500KVSubstation-AdjacentWADouglas County500 kV1,000 MW3.5 yrs63.7
OZ LincolnGreenfieldWALincoln——3.5 yrs57.5
GRAND COULEESubstation-AdjacentWADouglas County115 kV100 MW3.5 yrs55.2
TAP206249Substation-AdjacentWALincoln County115 kV100 MW3.5 yrs54.8
CRESTONSubstation-AdjacentWALincoln County115 kV100 MW3.5 yrs54.8
UNKNOWN202923Substation-AdjacentWALincoln County115 kV100 MW3.5 yrs54.8
TAP203460Substation-AdjacentWADouglas County115 kV100 MW3.5 yrs54.7

Who owns the transmission lines at TAP206249?

The 3 connected lines listed above are owned by BONNEVILLE POWER ADMINISTRATION, AVISTA CORP. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 16 miles.

How do candidate sites near TAP206249 score?

The 8 highest-scoring candidate sites within about 25 miles range from 55 to 64 on the 0–100 DC Readiness scale. They fall in Douglas County, Lincoln, Lincoln County. The Washington average across 6,019 scored sites is 51.7. 1,343 of those Washington sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP206249 substation?

TAP206249 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP206249 is at the national midpoint.

How many transmission lines connect to TAP206249 substation?

3 transmission lines terminate at or pass through TAP206249 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 16 miles.

Who owns TAP206249 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP206249 belong to AVISTA CORP, and others to BONNEVILLE POWER ADMINISTRATION. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP206249 substation located?

TAP206249 is in Washington at 47.7722, -118.6994. The datacenter candidate sites closest to it are in Douglas County, Lincoln, Lincoln County.

Are there datacenter candidate sites near TAP206249 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP206249. The highest-scoring is GRAND COULEE 230KV at 64/100. Across Washington, the average DC Readiness score is 51.7.

More in Washington

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP206249 substation, Washington”, https://gridcensus.com/substations/washington/tap206249-908a78b2 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP206249 substation, Washington is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.