Skip to content
Gridcensus

TAP152886

Substation

Virginia · TENNESSEE VALLEY AUTHORITY

Max voltage
—
kV

At a glance

TAP152886 is an electric substation in Virginia on TENNESSEE VALLEY AUTHORITY's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is Bristol Demolition Landfill in Bristol, with a DC Readiness score of 65/100.

TAP152886 is an electric transmission substation in Virginia, on TENNESSEE VALLEY AUTHORITY's transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

Line owner (most lines)TENNESSEE VALLEY AUTHORITY
Coordinates36.6044, -82.1510

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#117771—TENNESSEE VALLEY AUTHORITYIN SERVICE2.3 mi
#127354—KINGSPORT POWER COIN SERVICE1.5 mi
#150398—TENNESSEE VALLEY AUTHORITYIN SERVICE0.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152886, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152886 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Bristol Demolition LandfillBrownfieldVABristol—0 MW5.1 yrs64.6
SULLIVANSubstation-AdjacentTNSullivan County500 kV1,000 MW4.7 yrs63.7
OZ BristolGreenfieldVABristol——5.1 yrs62.4
UNKNOWN113973Substation-AdjacentVABristol city138 kV100 MW5.1 yrs60.7
NORTH BRISTOLSubstation-AdjacentVABristol city138 kV100 MW5.1 yrs60.6
EC Coal Russell CountyGreenfieldVARussell County——5.1 yrs60.5
EC Coal Russell CountyGreenfieldVARussell County——5.1 yrs60.0
CLINCH RIVERSubstation-AdjacentVARussell County138 kV100 MW5.1 yrs59.8

Who owns the transmission lines at TAP152886?

The 3 connected lines listed above are owned by TENNESSEE VALLEY AUTHORITY, KINGSPORT POWER CO. Their combined recorded length is about 4 miles.

How do candidate sites near TAP152886 score?

The 8 highest-scoring candidate sites within about 25 miles range from 60 to 65 on the 0–100 DC Readiness scale. They fall in Bristol, Sullivan County, Bristol city, Russell County. The Virginia average across 5,871 scored sites is 52.6. 733 of those Virginia sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP152886 substation?

3 transmission lines terminate at or pass through TAP152886 in the HIFLD line data. Together the listed lines cover about 4 miles.

Who owns TAP152886 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP152886 belong to TENNESSEE VALLEY AUTHORITY, and others to KINGSPORT POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP152886 substation located?

TAP152886 is in Virginia at 36.6044, -82.1510. The datacenter candidate sites closest to it are in Bristol, Sullivan County, Bristol city.

Are there datacenter candidate sites near TAP152886 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP152886. The highest-scoring is Bristol Demolition Landfill at 65/100. Across Virginia, the average DC Readiness score is 52.6.

More in Virginia

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP152886 substation, Virginia”, https://gridcensus.com/substations/virginia/tap152886-4280b796 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP152886 substation, Virginia is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.