Skip to content
Gridcensus

TAP206480

Substation

Utah

Max voltage
230
kV

TAP206480 is an electric transmission substation in Utah. It is classified as high-voltage (230 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage138 kV
Voltage classHigh-voltage (230 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateUtah
Coordinates38.2199, -112.9238

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP206480, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP206480 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BLM Solar DLA: Milford Flats SouthGreenfieldUTBeaver County—1,690 MW3.5 yrs59.5
MILDFORD WINDSubstation-AdjacentUTBeaver County345 kV600 MW3.5 yrs58.6
UNKNOWN206482Substation-AdjacentUTPiute County230 kV300 MW3.5 yrs58.3
PAROWANSubstation-AdjacentUTIron County230 kV300 MW3.5 yrs58.0
Greenfield (INTERMOUNTAIN - ADELANTO)GreenfieldUTIron County500 kV1,000 MW3.5 yrs57.0
TAP206480Substation-AdjacentUTBeaver County230 kV300 MW3.5 yrs56.1
Greenfield (INTERMOUNTAIN - ADELANTO)GreenfieldUTIron County500 kV1,000 MW3.5 yrs56.0
Greenfield (INTERMOUNTAIN - ADELANTO)GreenfieldUTIron County500 kV1,000 MW3.5 yrs55.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP206480 substation, Utah is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.