Skip to content
Gridcensus

MILDFORD WIND

Substation-Adjacent

Beaver County, Utah · WECC

DC Readiness
54.6
Fair / 100

MILDFORD WIND is a substation-adjacent datacenter candidate site in Beaver County, Utah, interconnecting through WECC. It screens at 54.6/100 DC Readiness with a catalogued 600 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationMILDFORD WIND
Substation distance0.0 mi
Substation voltage345 kV
Available capacity600 MW

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPTonaquint Data Center - Saint George
IXP distance108.6 mi
Fiber providers1
Fiber coverage50.2%

Site characteristics

Land contactBeaver County County Assessor

Risk & environment

Water stress (WRI)High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterTonaquint Data Center - Saint George
DC distance108.6 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.23¢/kWh
Industrial electricity7.85¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$3,779

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
87
Speed to power15%
44
Fiber connectivity12%
26
Energy cost10%
50
Water risk8%
24
Natural hazard8%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Beaver County, ranked by DC Readiness.

Sites near MILDFORD WIND
SiteTypeVoltageCapacityQueue waitScore
BLM Solar DLA: Milford Flats SouthGreenfield1,690 MW1.7 yrs60.9
OZ BeaverGreenfield1.7 yrs55.6
BLM Solar DLA: Wah Wah ValleyGreenfield1,599 MW1.7 yrs54.9
TAP206480Substation-Adjacent230 kV300 MW6.9 yrs52.7
Greenfield (INTERMOUNTAIN - ADELANTO)Greenfield500 kV1,000 MW6.9 yrs50.8
Greenfield (INTERMOUNTAIN - ADELANTO)Greenfield500 kV1,000 MW6.9 yrs50.8
Greenfield (INTERMOUNTAIN - ADELANTO)Greenfield500 kV1,000 MW6.9 yrs50.8
Greenfield (INTERMOUNTAIN - ADELANTO)Greenfield500 kV1,000 MW6.9 yrs50.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MILDFORD WIND, Beaver County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.