Skip to content
Gridcensus

TENNECO

Substation

Texas

Max voltage
69
kV

At a glance

TENNECO is a 69 kV electric substation in Texas, recorded in the HIFLD transmission dataset. 0 transmission lines connect to it. 1,256 of Texas's 1,426 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is MUSTANG in Yoakum County, with a DC Readiness score of 59/100.

TENNECO is an electric transmission substation in Texas. It is classified as distribution (69–115 kv) and connects 0 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines0

Ownership

No owner is recorded for the lines that connect here.

StateTexas
Coordinates32.6822, -102.7948

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TENNECO, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TENNECO substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
MUSTANGSubstation-AdjacentTXYoakum County230 kV300 MW3.5 yrs59.0
WASSON SWITCHINGSubstation-AdjacentTXYoakum County230 kV300 MW3.5 yrs58.9
TAP308106Substation-AdjacentTXYoakum County230 kV300 MW3.5 yrs58.8
SEMINOLESubstation-AdjacentTXGaines County230 kV300 MW3.5 yrs58.2
EC Near Gaines CountyGreenfieldTXGaines——3.5 yrs57.9
EC Near Gaines CountyGreenfieldTXGaines——3.5 yrs56.7
EC Near Gaines CountyGreenfieldTXGaines——3.5 yrs56.7
EC Near Gaines CountyGreenfieldTXGaines——3.5 yrs56.5

How does TENNECO compare with other substations in Texas?

Texas has 4,939 substation records in HIFLD, of which 1,426 carry a station name; the rest are unnamed tap points, risers and line ends. 165 named substations in the state are in TENNECO's 69–114 kV band (12% of named stations). 1,256 sit in a higher band. 200 named substations in Texas operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 138 kV.

How do candidate sites near TENNECO score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 59 on the 0–100 DC Readiness scale. They fall in Yoakum County, Gaines County, Gaines. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TENNECO substation?

TENNECO has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TENNECO is below the national midpoint.

How many transmission lines connect to TENNECO substation?

0 transmission lines terminate at or pass through TENNECO in the HIFLD line data.

Where is TENNECO substation located?

TENNECO is in Texas at 32.6822, -102.7948. The datacenter candidate sites closest to it are in Yoakum County, Gaines County, Gaines.

Are there datacenter candidate sites near TENNECO substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TENNECO. The highest-scoring is MUSTANG at 59/100. Across Texas, the average DC Readiness score is 56.4.

Other 69 kV substations in Texas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TENNECO substation, Texas”, https://gridcensus.com/substations/texas/tenneco-57864810 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TENNECO substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.