Skip to content
Gridcensus

DEVINE

Substation

Texas · BANDERA ELECTRIC COOP, INC

Max voltage
69
kV

At a glance

DEVINE is a 69 kV electric substation in Texas on BANDERA ELECTRIC COOP, INC's transmission network, recorded in the HIFLD transmission dataset. 4 transmission lines connect to it. 1,256 of Texas's 1,426 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is CAGNON ROAD in Bexar County, with a DC Readiness score of 69/100.

DEVINE is an electric transmission substation in Texas, on BANDERA ELECTRIC COOP, INC's transmission network. It is classified as distribution (69–115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines4

Ownership

Line owner (most lines)BANDERA ELECTRIC COOP, INC
StateTexas
Coordinates29.1340, -98.8974

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#309512138 kVAEP TEXAS CENTRAL COMPANYIN SERVICE6.2 mi
#30377569 kVAEP TEXAS CENTRAL CO.—1.7 mi
#30720269 kVBANDERA ELECTRIC COOP, INCIN SERVICE7.0 mi
#30879869 kVBANDERA ELECTRIC COOP, INCIN SERVICE2.1 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of DEVINE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near DEVINE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
CAGNON ROADSubstation-AdjacentTXBexar County345 kV600 MW3.5 yrs69.3
OZ BexarGreenfieldTXBexar——3.5 yrs65.8
EC Near Leon CreekGreenfieldTXBexar——3.5 yrs65.1
OZ BexarGreenfieldTXBexar——3.5 yrs65.0
EC Near Covel Gardens Gas RecoveryGreenfieldTXBexar——3.5 yrs65.0
OZ BexarGreenfieldTXBexar——3.5 yrs65.0
TAP305263Substation-AdjacentTXBexar County138 kV100 MW3.5 yrs64.2
FIVE POINTSSubstation-AdjacentTXBexar County138 kV100 MW3.5 yrs64.2

How does DEVINE compare with other substations in Texas?

Texas has 4,939 substation records in HIFLD, of which 1,426 carry a station name; the rest are unnamed tap points, risers and line ends. 165 named substations in the state are in DEVINE's 69–114 kV band (12% of named stations). 1,256 sit in a higher band. 200 named substations in Texas operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 138 kV.

Who owns the transmission lines at DEVINE?

The 4 connected lines listed above are owned by AEP TEXAS CENTRAL COMPANY, AEP TEXAS CENTRAL CO., BANDERA ELECTRIC COOP, INC. Line voltages range from 69 kV to 138 kV. Their combined recorded length is about 17 miles.

How do candidate sites near DEVINE score?

The 8 highest-scoring candidate sites within about 25 miles range from 64 to 69 on the 0–100 DC Readiness scale. They fall in Bexar County, Bexar. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is DEVINE substation?

DEVINE has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so DEVINE is below the national midpoint.

How many transmission lines connect to DEVINE substation?

4 transmission lines terminate at or pass through DEVINE in the HIFLD line data. The connected lines listed here run at 138 kV, 69 kV. Together the listed lines cover about 17 miles.

Who owns DEVINE substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at DEVINE belong to BANDERA ELECTRIC COOP, INC, and others to AEP TEXAS CENTRAL CO., AEP TEXAS CENTRAL COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is DEVINE substation located?

DEVINE is in Texas at 29.1340, -98.8974. The datacenter candidate sites closest to it are in Bexar County, Bexar.

Are there datacenter candidate sites near DEVINE substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of DEVINE. The highest-scoring is CAGNON ROAD at 69/100. Across Texas, the average DC Readiness score is 56.4.

Other 69 kV substations in Texas

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “DEVINE substation, Texas”, https://gridcensus.com/substations/texas/devine-cae297e8 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for DEVINE substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.