KENDALL
SubstationTexas · BANDERA ELECTRIC COOP, INC
At a glance
KENDALL is an electric transmission substation in Texas, on BANDERA ELECTRIC COOP, INC's transmission network. It is classified as high-voltage (345 kv) and connects 10 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #302826 | 345 kV | BANDERA ELECTRIC COOP, INC | IN SERVICE | 50.6 mi |
| #305942 | 345 kV | PEDERNALES ELECTRIC COOP, INC | IN SERVICE | 61.3 mi |
| #310102 | 345 kV | CENTRAL TEXAS ELEC COOP, INC | IN SERVICE | 51.5 mi |
| #312517 | 345 kV | CENTRAL TEXAS ELEC COOP, INC | IN SERVICE | 51.5 mi |
| #306446 | 138 kV | BANDERA ELECTRIC COOP, INC | IN SERVICE | 0.2 mi |
| #307100 | 138 kV | CENTRAL TEXAS ELEC COOP, INC | IN SERVICE | 20.7 mi |
| #308595 | 138 kV | BANDERA ELECTRIC COOP, INC | IN SERVICE | 1.2 mi |
| #304795 | 138 kV | BANDERA ELECTRIC COOP, INC | IN SERVICE | 1.1 mi |
| #309594 | 138 kV | BANDERA ELECTRIC COOP, INC | IN SERVICE | 10.2 mi |
| #304519 | 69 kV | BANDERA ELECTRIC COOP, INC | IN SERVICE | 0.3 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of KENDALL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| HILL COUNTRY 345 | Substation-Adjacent | TX | Bexar County | 345 kV | 600 MW | 3.5 yrs | 68.2 |
| U.T.S.A. | Substation-Adjacent | TX | Bexar County | 138 kV | 100 MW | 3.5 yrs | 62.6 |
| LA SIERRA | Substation-Adjacent | TX | Bexar County | 138 kV | 100 MW | 3.5 yrs | 62.4 |
| RANCHTOWN | Substation-Adjacent | TX | Bexar County | 138 kV | 100 MW | 3.5 yrs | 61.8 |
| PANTHER SPRINGS | Substation-Adjacent | TX | Bexar County | 138 kV | 100 MW | 3.5 yrs | 61.7 |
| FAIR OAKS RANCH | Substation-Adjacent | TX | Kendall County | 138 kV | 100 MW | 3.5 yrs | 61.6 |
| KENDALL | Substation-Adjacent | TX | Kendall County | 345 kV | 600 MW | 3.5 yrs | 61.2 |
| FAIR OAKS | Substation-Adjacent | TX | Kendall County | 138 kV | 100 MW | 3.5 yrs | 60.8 |
How does KENDALL compare with other substations in Texas?
Texas has 4,939 substation records in HIFLD, of which 1,426 carry a station name; the rest are unnamed tap points, risers and line ends. 198 named substations in the state are in KENDALL's 345–499 kV band (14% of named stations). 2 sit in a higher band. 200 named substations in Texas operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 138 kV.
Who owns the transmission lines at KENDALL?
The 10 connected lines listed above are owned by BANDERA ELECTRIC COOP, INC, PEDERNALES ELECTRIC COOP, INC, CENTRAL TEXAS ELEC COOP, INC. Line voltages range from 69 kV to 345 kV. Their combined recorded length is about 248.5 miles.
How do candidate sites near KENDALL score?
The 8 highest-scoring candidate sites within about 25 miles range from 61 to 68 on the 0–100 DC Readiness scale. They fall in Bexar County, Kendall County. The Texas average across 6,839 scored sites is 56.4. 3,635 of those Texas sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is KENDALL substation?
KENDALL has a maximum voltage of 345 kV and a minimum of 69 kV. That places it in the 345–499 kV band. The median named US substation in this dataset is 115 kV, so KENDALL is above the national midpoint.
How many transmission lines connect to KENDALL substation?
10 transmission lines terminate at or pass through KENDALL in the HIFLD line data. The connected lines listed here run at 345 kV, 138 kV, 69 kV. Together the listed lines cover about 248.5 miles.
Who owns KENDALL substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at KENDALL belong to BANDERA ELECTRIC COOP, INC, and others to CENTRAL TEXAS ELEC COOP, INC, PEDERNALES ELECTRIC COOP, INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is KENDALL substation located?
KENDALL is in Texas at 29.9850, -98.8867. The datacenter candidate sites closest to it are in Bexar County, Kendall County.
Are there datacenter candidate sites near KENDALL substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of KENDALL. The highest-scoring is HILL COUNTRY 345 at 68/100. Across Texas, the average DC Readiness score is 56.4.
Other 345 kV substations in Texas
- GREENS BAYOU 345· 21 lines
- ROYSE· 17 lines
- CEDAR BAYOU PLANT· 16 lines
- PH ROBINSON· 16 lines
- VENUS· 16 lines
- SKYLINE· 15 lines
- SOTEX5· 15 lines
- PARISH· 14 lines
- All named substations in Texas· 1,426 stations
- Datacenter candidate sites in Texas· 6,839 sites
- Brownfield and retired plant sites in Texas
- Substations by state
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “KENDALL substation, Texas”, https://gridcensus.com/substations/texas/kendall-86d033d7 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for KENDALL substation, Texas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.