Skip to content
Gridcensus

WESTT LEXINGTON CHESTERFIELD

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
161
kV

At a glance

WESTT LEXINGTON CHESTERFIELD is a 161 kV electric substation in Tennessee on TENNESSEE VALLEY AUTHORITY's transmission network, recorded in the HIFLD transmission dataset. 4 transmission lines connect to it. 26 of Tennessee's 517 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is JOHNSONVILLE in Benton County, with a DC Readiness score of 72/100.

WESTT LEXINGTON CHESTERFIELD is an electric transmission substation in Tennessee, on TENNESSEE VALLEY AUTHORITY's transmission network. It is classified as sub-transmission (138 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines4

Ownership

Line owner (most lines)TENNESSEE VALLEY AUTHORITY
Coordinates35.6366, -88.2713

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#102387161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE0.2 mi
#129091161 kVTENNESSEE VALLEY AUTHORITYIN SERVICE9.1 mi
#162434161 kV—IN SERVICE14.0 mi
#172263——IN SERVICE7.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WESTT LEXINGTON CHESTERFIELD, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WESTT LEXINGTON CHESTERFIELD substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
JOHNSONVILLESubstation-AdjacentTNBenton County500 kV1,000 MW3.9 yrs71.8
Greenfield (JOHNSONVILLE - GLEASON)GreenfieldTNBenton County500 kV1,000 MW3.9 yrs62.0
EC Near JohnsonvilleGreenfieldTNHumphreys——3.9 yrs60.6
HUSTBURGSubstation-AdjacentTNBenton County161 kV100 MW3.9 yrs60.5
EC Near JohnsonvilleGreenfieldTNHumphreys——3.9 yrs59.7
BEECH BLUFFSubstation-AdjacentTNMadison County161 kV100 MW3.9 yrs59.5
JACKS CREEKSubstation-AdjacentTNChester County161 kV100 MW3.9 yrs59.5
HUNTINGDONSubstation-AdjacentTNCarroll County161 kV100 MW3.9 yrs59.5

How does WESTT LEXINGTON CHESTERFIELD compare with other substations in Tennessee?

Tennessee has 1,967 substation records in HIFLD, of which 517 carry a station name; the rest are unnamed tap points, risers and line ends. 376 named substations in the state are in WESTT LEXINGTON CHESTERFIELD's 115–229 kV band (73% of named stations). 26 sit in a higher band. 25 named substations in Tennessee operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 161 kV.

Who owns the transmission lines at WESTT LEXINGTON CHESTERFIELD?

The 4 connected lines listed above are owned by TENNESSEE VALLEY AUTHORITY. Line voltages range from 161 kV to 161 kV. Their combined recorded length is about 30.8 miles.

How do candidate sites near WESTT LEXINGTON CHESTERFIELD score?

The 8 highest-scoring candidate sites within about 25 miles range from 60 to 72 on the 0–100 DC Readiness scale. They fall in Benton County, Humphreys, Madison County, Chester County. The Tennessee average across 2,190 scored sites is 57. 886 of those Tennessee sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is WESTT LEXINGTON CHESTERFIELD substation?

WESTT LEXINGTON CHESTERFIELD has a maximum voltage of 161 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so WESTT LEXINGTON CHESTERFIELD is above the national midpoint.

How many transmission lines connect to WESTT LEXINGTON CHESTERFIELD substation?

4 transmission lines terminate at or pass through WESTT LEXINGTON CHESTERFIELD in the HIFLD line data. The connected lines listed here run at 161 kV. Together the listed lines cover about 30.8 miles.

Who owns WESTT LEXINGTON CHESTERFIELD substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at WESTT LEXINGTON CHESTERFIELD belong to TENNESSEE VALLEY AUTHORITY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is WESTT LEXINGTON CHESTERFIELD substation located?

WESTT LEXINGTON CHESTERFIELD is in Tennessee at 35.6366, -88.2713. The datacenter candidate sites closest to it are in Benton County, Humphreys, Madison County.

Are there datacenter candidate sites near WESTT LEXINGTON CHESTERFIELD substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of WESTT LEXINGTON CHESTERFIELD. The highest-scoring is JOHNSONVILLE at 72/100. Across Tennessee, the average DC Readiness score is 57.

Other 161 kV substations in Tennessee

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “WESTT LEXINGTON CHESTERFIELD substation, Tennessee”, https://gridcensus.com/substations/tennessee/westt-lexington-chesterfield-423ed818 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for WESTT LEXINGTON CHESTERFIELD substation, Tennessee is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.