Skip to content
Gridcensus

TAP152105

Substation

Tennessee · KINGSPORT POWER CO

Max voltage
161
kV

At a glance

TAP152105 is a 161 kV electric substation in Tennessee on KINGSPORT POWER CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is NAGEL in Scott County, with a DC Readiness score of 65/100.

TAP152105 is an electric transmission substation in Tennessee, on KINGSPORT POWER CO's transmission network. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership

Line owner (most lines)KINGSPORT POWER CO
Coordinates36.3804, -82.9527

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#117780161 kVKINGSPORT POWER COIN SERVICE0.6 mi
#124001161 kVKINGSPORT POWER COIN SERVICE53.4 mi
#167267161 kVKINGSPORT POWER COIN SERVICE14.8 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152105, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152105 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NAGELSubstation-AdjacentTNScott County500 kV1,000 MW4.7 yrs64.7
OZ HamblenGreenfieldTNHamblen——3.9 yrs64.0
OZ HamblenGreenfieldTNHamblen——3.9 yrs63.9
PHILLIPS BENDSubstation-AdjacentTNHawkins County500 kV1,000 MW4.7 yrs63.8
EC Coal Hamblen CountyGreenfieldTNHamblen County——3.9 yrs63.3
OZ LeeGreenfieldVALee——5.1 yrs62.4
EC Near John SevierGreenfieldTNHawkins——3.9 yrs61.9
WHITE PINESubstation-AdjacentTNHamblen County161 kV100 MW3.9 yrs61.7

Who owns the transmission lines at TAP152105?

The 3 connected lines listed above are owned by KINGSPORT POWER CO. Line voltages range from 161 kV to 161 kV. Their combined recorded length is about 68.7 miles.

How do candidate sites near TAP152105 score?

The 8 highest-scoring candidate sites within about 25 miles range from 62 to 65 on the 0–100 DC Readiness scale. They fall in Scott County, Hamblen, Hawkins County, Hamblen County. The Tennessee average across 2,190 scored sites is 57. 886 of those Tennessee sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP152105 substation?

TAP152105 has a maximum voltage of 161 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP152105 is above the national midpoint.

How many transmission lines connect to TAP152105 substation?

3 transmission lines terminate at or pass through TAP152105 in the HIFLD line data. The connected lines listed here run at 161 kV. Together the listed lines cover about 68.7 miles.

Who owns TAP152105 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP152105 belong to KINGSPORT POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP152105 substation located?

TAP152105 is in Tennessee at 36.3804, -82.9527. The datacenter candidate sites closest to it are in Scott County, Hamblen, Hawkins County.

Are there datacenter candidate sites near TAP152105 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP152105. The highest-scoring is NAGEL at 65/100. Across Tennessee, the average DC Readiness score is 57.

More in Tennessee

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP152105 substation, Tennessee”, https://gridcensus.com/substations/tennessee/tap152105-592974ee (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP152105 substation, Tennessee is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.