NORTH SWEETWATER

Substation

Tennessee

Max voltage
161
kV

NORTH SWEETWATER is an electric transmission substation in Tennessee. It is classified as sub-transmission (138 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.6076, -84.4518

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NORTH SWEETWATER, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NORTH SWEETWATER substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN115540Substation-AdjacentTNRoane County500 kV1,000 MW1.0 yrs70.3
OAK RIDGE RESERVATION (USDOE)BrownfieldTNAnderson161 kV0 MW1.0 yrs67.6
UNKNOWN170313Substation-AdjacentTNBradley County500 kV1,000 MW1.0 yrs67.1
EATONSubstation-AdjacentTNLoudon County161 kV100 MW1.0 yrs66.8
WATT ROADSubstation-AdjacentTNLoudon County161 kV100 MW1.0 yrs66.4
TAP152166Substation-AdjacentTNLoudon County161 kV100 MW1.0 yrs66.2
FORT LOUDON DAMSubstation-AdjacentTNLoudon County161 kV100 MW1.0 yrs66.2
WATTS BAR POWER STATIONSubstation-AdjacentTNMeigs County500 kV1,000 MW1.0 yrs65.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for NORTH SWEETWATER substation, Tennessee. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.