NEWPORT

Substation

Tennessee · FRENCH BROAD ELEC MEMBER CORP

Max voltage
—
kV

At a glance

NEWPORT is an electric substation in Tennessee on FRENCH BROAD ELEC MEMBER CORP's transmission network, recorded in the HIFLD transmission dataset. 2 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is OZ Hamblen in Hamblen, with a DC Readiness score of 64/100.

NEWPORT is an electric transmission substation in Tennessee, on FRENCH BROAD ELEC MEMBER CORP's transmission network. It is classified as unclassified and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines2

Ownership

Line owner (most lines)FRENCH BROAD ELEC MEMBER CORP
Coordinates35.9706, -83.2038

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#100438—FRENCH BROAD ELEC MEMBER CORPIN SERVICE1.5 mi
#142938—FRENCH BROAD ELEC MEMBER CORPIN SERVICE0.6 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of NEWPORT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near NEWPORT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ HamblenGreenfieldTNHamblen——3.9 yrs64.0
OZ HamblenGreenfieldTNHamblen——3.9 yrs63.9
EC Coal Hamblen CountyGreenfieldTNHamblen County——3.9 yrs63.3
Greenfield (PHILLIPS BEND - VOLUNTEER)GreenfieldTNGrainger County500 kV1,000 MW3.9 yrs62.9
EC Near John SevierGreenfieldTNHawkins——3.9 yrs61.9
CHEROKEE DAMSubstation-AdjacentTNGrainger County161 kV100 MW3.9 yrs61.8
BULLS GAPSubstation-AdjacentTNHamblen County161 kV100 MW3.9 yrs61.7
WHITE PINESubstation-AdjacentTNHamblen County161 kV100 MW3.9 yrs61.7

Who owns the transmission lines at NEWPORT?

The 2 connected lines listed above are owned by FRENCH BROAD ELEC MEMBER CORP. Their combined recorded length is about 2.1 miles.

How do candidate sites near NEWPORT score?

The 8 highest-scoring candidate sites within about 25 miles range from 62 to 64 on the 0–100 DC Readiness scale. They fall in Hamblen, Hamblen County, Grainger County, Hawkins. The Tennessee average across 2,190 scored sites is 57. 886 of those Tennessee sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to NEWPORT substation?

2 transmission lines terminate at or pass through NEWPORT in the HIFLD line data. Together the listed lines cover about 2.1 miles.

Who owns NEWPORT substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at NEWPORT belong to FRENCH BROAD ELEC MEMBER CORP. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is NEWPORT substation located?

NEWPORT is in Tennessee at 35.9706, -83.2038. The datacenter candidate sites closest to it are in Hamblen, Hamblen County, Grainger County.

Are there datacenter candidate sites near NEWPORT substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of NEWPORT. The highest-scoring is OZ Hamblen at 64/100. Across Tennessee, the average DC Readiness score is 57.

More in Tennessee

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “NEWPORT substation, Tennessee”, https://gridcensus.com/substations/tennessee/newport-3252aaed (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for NEWPORT substation, Tennessee is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.