GETWELL

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
—
kV

At a glance

GETWELL is an electric substation in Tennessee on TENNESSEE VALLEY AUTHORITY's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is FREEPORT in DeSoto County, with a DC Readiness score of 72/100.

GETWELL is an electric transmission substation in Tennessee, on TENNESSEE VALLEY AUTHORITY's transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

Line owner (most lines)TENNESSEE VALLEY AUTHORITY
Coordinates35.0850, -89.9320

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#138407—TENNESSEE VALLEY AUTHORITYIN SERVICE4.0 mi
#143379—TENNESSEE VALLEY AUTHORITYIN SERVICE7.4 mi
#145786—TENNESSEE VALLEY AUTHORITYIN SERVICE4.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of GETWELL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near GETWELL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FREEPORTSubstation-AdjacentTNDeSoto County500 kV1,000 MW3.9 yrs71.8
SHELBYSubstation-AdjacentTNTipton County500 kV1,000 MW3.9 yrs71.3
CORDOVASubstation-AdjacentTNShelby County500 kV1,000 MW3.9 yrs71.2
UNKNOWN115609Substation-AdjacentTNCrittenden County500 kV1,000 MW3.9 yrs68.3
OZ ShelbyGreenfieldTNShelby——3.9 yrs66.0
UNKNOWN110942Substation-AdjacentMSDeSoto County230 kV300 MW4.3 yrs66.0
HORN LAKESubstation-AdjacentMSDeSoto County230 kV300 MW4.3 yrs66.0
Greenfield (CORDOVA - AURORA)GreenfieldFLFayette County500 kV1,000 MW3.7 yrs65.9

Who owns the transmission lines at GETWELL?

The 3 connected lines listed above are owned by TENNESSEE VALLEY AUTHORITY. Their combined recorded length is about 15.4 miles.

How do candidate sites near GETWELL score?

The 8 highest-scoring candidate sites within about 25 miles range from 66 to 72 on the 0–100 DC Readiness scale. They fall in DeSoto County, Tipton County, Shelby County, Crittenden County. The Tennessee average across 2,190 scored sites is 57. 886 of those Tennessee sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to GETWELL substation?

3 transmission lines terminate at or pass through GETWELL in the HIFLD line data. Together the listed lines cover about 15.4 miles.

Who owns GETWELL substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at GETWELL belong to TENNESSEE VALLEY AUTHORITY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is GETWELL substation located?

GETWELL is in Tennessee at 35.0850, -89.9320. The datacenter candidate sites closest to it are in DeSoto County, Tipton County, Shelby County.

Are there datacenter candidate sites near GETWELL substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of GETWELL. The highest-scoring is FREEPORT at 72/100. Across Tennessee, the average DC Readiness score is 57.

More in Tennessee

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “GETWELL substation, Tennessee”, https://gridcensus.com/substations/tennessee/getwell-01f3400b (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for GETWELL substation, Tennessee is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.