ALCOA PRIMARY

Substation

Tennessee · TENNESSEE VALLEY AUTHORITY

Max voltage
—
kV

At a glance

ALCOA PRIMARY is an electric substation in Tennessee on TENNESSEE VALLEY AUTHORITY's transmission network, recorded in the HIFLD transmission dataset. 0 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is BULL RUN in Anderson County, with a DC Readiness score of 72/100.

ALCOA PRIMARY is an electric transmission substation in Tennessee, on TENNESSEE VALLEY AUTHORITY's transmission network. It is classified as unclassified and connects 0 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines0

Ownership

Line owner (most lines)TENNESSEE VALLEY AUTHORITY
Coordinates35.7784, -83.9704

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#124027161 kVTENNESSEE VALLEY AUTHORITYINACTIVE0.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ALCOA PRIMARY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ALCOA PRIMARY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
BULL RUNSubstation-AdjacentTNAnderson County500 kV1,000 MW3.9 yrs72.2
VOLUNTEERSubstation-AdjacentTNKnox County500 kV1,000 MW3.9 yrs71.5
OZ KnoxGreenfieldTNKnox——3.9 yrs67.1
OZ KnoxGreenfieldTNKnox——3.9 yrs66.7
OAK RIDGE RESERVATION (USDOE)BrownfieldTNAnderson161 kV0 MW3.9 yrs65.1
OZ KnoxGreenfieldTNKnox——3.9 yrs65.1
LONSDALESubstation-AdjacentTNKnox County161 kV100 MW3.9 yrs64.6
OZ KnoxGreenfieldTNKnox——3.9 yrs64.5

Who owns the transmission lines at ALCOA PRIMARY?

The 1 connected line listed above is owned by TENNESSEE VALLEY AUTHORITY. Line voltages range from 161 kV to 161 kV. Their combined recorded length is about 0.5 miles.

How do candidate sites near ALCOA PRIMARY score?

The 8 highest-scoring candidate sites within about 25 miles range from 65 to 72 on the 0–100 DC Readiness scale. They fall in Anderson County, Knox County, Knox, Anderson. The Tennessee average across 2,190 scored sites is 57. 886 of those Tennessee sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to ALCOA PRIMARY substation?

0 transmission lines terminate at or pass through ALCOA PRIMARY in the HIFLD line data. The connected lines listed here run at 161 kV. Together the listed lines cover about 0.5 miles.

Who owns ALCOA PRIMARY substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at ALCOA PRIMARY belong to TENNESSEE VALLEY AUTHORITY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is ALCOA PRIMARY substation located?

ALCOA PRIMARY is in Tennessee at 35.7784, -83.9704. The datacenter candidate sites closest to it are in Anderson County, Knox County, Knox.

Are there datacenter candidate sites near ALCOA PRIMARY substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of ALCOA PRIMARY. The highest-scoring is BULL RUN at 72/100. Across Tennessee, the average DC Readiness score is 57.

More in Tennessee

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “ALCOA PRIMARY substation, Tennessee”, https://gridcensus.com/substations/tennessee/alcoa-primary-f363bdab (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for ALCOA PRIMARY substation, Tennessee is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.