TAP161852

Substation

South Dakota · WAPA-- WESTERN AREA POWER ADMINISTRATION

Max voltage
69
kV

At a glance

TAP161852 is a 69 kV electric substation in South Dakota on WAPA-- WESTERN AREA POWER ADMINISTRATION's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is FORT THOMPSON in Buffalo County, with a DC Readiness score of 63/100.

TAP161852 is an electric transmission substation in South Dakota, on WAPA-- WESTERN AREA POWER ADMINISTRATION's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Coordinates44.3830, -99.4412

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#16274369 kV—IN SERVICE10.5 mi
#16274469 kV—IN SERVICE0.0 mi
#16274569 kVWAPA-- WESTERN AREA POWER ADMINISTRATIONIN SERVICE17.2 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP161852, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP161852 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FORT THOMPSONSubstation-AdjacentSDBuffalo County345 kV600 MW4.3 yrs63.0
UNKNOWN133185Substation-AdjacentSDHyde County230 kV300 MW4.3 yrs61.9
EC Near Future CTGreenfieldSDHyde——4.3 yrs59.4
EC Near HighmoreGreenfieldSDHyde——4.3 yrs59.3
EC Near Future CTGreenfieldSDHyde——4.3 yrs58.8
EC Near HighmoreGreenfieldSDHyde——4.3 yrs58.7
EC Near Future CTGreenfieldSDHyde——4.3 yrs58.7
EC Near Future CTGreenfieldSDHyde——4.3 yrs58.5

Who owns the transmission lines at TAP161852?

The 3 connected lines listed above are owned by WAPA-- WESTERN AREA POWER ADMINISTRATION. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 27.8 miles.

How do candidate sites near TAP161852 score?

The 8 highest-scoring candidate sites within about 25 miles range from 59 to 63 on the 0–100 DC Readiness scale. They fall in Buffalo County, Hyde County, Hyde. The South Dakota average across 1,151 scored sites is 54.7. 477 of those South Dakota sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP161852 substation?

TAP161852 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP161852 is below the national midpoint.

How many transmission lines connect to TAP161852 substation?

3 transmission lines terminate at or pass through TAP161852 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 27.8 miles.

Who owns TAP161852 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP161852 belong to WAPA-- WESTERN AREA POWER ADMINISTRATION. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP161852 substation located?

TAP161852 is in South Dakota at 44.3830, -99.4412. The datacenter candidate sites closest to it are in Buffalo County, Hyde County, Hyde.

Are there datacenter candidate sites near TAP161852 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP161852. The highest-scoring is FORT THOMPSON at 63/100. Across South Dakota, the average DC Readiness score is 54.7.

More in South Dakota

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP161852 substation, South Dakota”, https://gridcensus.com/substations/south-dakota/tap161852-bbbe1861 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP161852 substation, South Dakota is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.