TAP167518

Substation

South Carolina

Max voltage
69
kV

TAP167518 is an electric transmission substation in South Carolina. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates32.7432, -81.1497

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP167518, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP167518 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WEST MCINTOSHSubstation-AdjacentGAEffingham County500 kV1,000 MW5.8 yrs65.6
UNKNOWN120914Substation-AdjacentSCHampton County230 kV300 MW3.9 yrs64.7
UNKNOWN120913Substation-AdjacentSCColleton County230 kV300 MW3.9 yrs64.1
YEMASSEESubstation-AdjacentSCColleton County230 kV300 MW3.9 yrs64.0
UNKNOWN120907Substation-AdjacentSCAllendale County115 kV100 MW3.9 yrs63.7
McIntoshBrownfieldGAJasper County230 kV178 MW5.8 yrs63.4
UNKNOWN167524Substation-AdjacentSCJasper County230 kV300 MW3.9 yrs62.9
UNKNOWN121080Substation-AdjacentSCJasper County230 kV300 MW3.9 yrs62.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP167518 substation, South Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.