Skip to content
Gridcensus

TAP154510

Substation

South Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
100
kV

At a glance

TAP154510 is a 100 kV electric substation in South Carolina operated by DUKE ENERGY CAROLINAS, LLC, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is SHADY GROVE in Greenville County, with a DC Readiness score of 66/100.

TAP154510 is an electric transmission substation in South Carolina, operated by DUKE ENERGY CAROLINAS, LLC. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage100 kV
Min voltage100 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership & operation

Coordinates34.6305, -82.5839

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#113115100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.5 mi
#122284100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE0.0 mi
#130427100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE1.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP154510, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP154510 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SHADY GROVESubstation-AdjacentSCGreenville County230 kV300 MW3.9 yrs66.3
UNKNOWN110410Substation-AdjacentSCOconee County500 kV1,000 MW3.9 yrs66.2
NORTH GREENVILLE TIESubstation-AdjacentSCGreenville County230 kV300 MW3.9 yrs66.0
TAP151035Substation-AdjacentSCGreenville County230 kV300 MW3.9 yrs65.9
OZ GreenvilleGreenfieldSCGreenville——3.9 yrs65.9
JOCASSEE TIESubstation-AdjacentSCPickens County500 kV1,000 MW3.9 yrs65.1
EC Near Enoree Phase II Landfill Gas RecoveryGreenfieldSCGreenville——3.9 yrs65.0
UNKNOWN113984Substation-AdjacentSCHart County230 kV300 MW3.9 yrs64.8

Who owns the transmission lines at TAP154510?

The 3 connected lines listed above are owned by DUKE ENERGY CAROLINAS, LLC. Line voltages range from 100 kV to 100 kV. Their combined recorded length is about 5.1 miles.

How do candidate sites near TAP154510 score?

The 8 highest-scoring candidate sites within about 25 miles range from 65 to 66 on the 0–100 DC Readiness scale. They fall in Greenville County, Oconee County, Greenville, Pickens County. The South Carolina average across 2,061 scored sites is 57.1. 1,124 of those South Carolina sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP154510 substation?

TAP154510 has a maximum voltage of 100 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP154510 is below the national midpoint.

How many transmission lines connect to TAP154510 substation?

3 transmission lines terminate at or pass through TAP154510 in the HIFLD line data. The connected lines listed here run at 100 kV. Together the listed lines cover about 5.1 miles.

Who owns TAP154510 substation?

HIFLD lists DUKE ENERGY CAROLINAS, LLC as the operator of TAP154510.

Where is TAP154510 substation located?

TAP154510 is in South Carolina at 34.6305, -82.5839. The datacenter candidate sites closest to it are in Greenville County, Oconee County, Greenville.

Are there datacenter candidate sites near TAP154510 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP154510. The highest-scoring is SHADY GROVE at 66/100. Across South Carolina, the average DC Readiness score is 57.1.

More in South Carolina

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP154510 substation, South Carolina”, https://gridcensus.com/substations/south-carolina/tap154510-ffd47772 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP154510 substation, South Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.