Skip to content
Gridcensus

TAP152625

Substation

South Carolina

Max voltage
115
kV

TAP152625 is an electric transmission substation in South Carolina. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

Coordinates34.2318, -81.4687

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152625, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152625 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
DEADEND167375Substation-AdjacentSCLexington County230 kV300 MW1.0 yrs69.7
UNKNOWN117831Substation-AdjacentSCLexington County230 kV300 MW1.0 yrs68.9
DEADEND170194Substation-AdjacentSCRichland County230 kV300 MW1.0 yrs68.6
UNKNOWN117127Substation-AdjacentSCFairfield County230 kV300 MW1.0 yrs68.5
UNKNOWN117190Substation-AdjacentSCNewberry County230 kV300 MW1.0 yrs67.0
UNKNOWN152556Substation-AdjacentSCFairfield County230 kV300 MW1.0 yrs66.9
POMARIASubstation-AdjacentSCNewberry County230 kV300 MW1.0 yrs66.8
WINNESBOROSubstation-AdjacentSCFairfield County230 kV300 MW1.0 yrs66.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP152625 substation, South Carolina. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.