Skip to content
Gridcensus

TAP142266

Substation

South Carolina · SOUTH CAROLINA ELECTRIC&GAS CO

Max voltage
115
kV

At a glance

TAP142266 is a 115 kV electric substation in South Carolina on SOUTH CAROLINA ELECTRIC&GAS CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN117189 in Aiken County, with a DC Readiness score of 65/100.

TAP142266 is an electric transmission substation in South Carolina, on SOUTH CAROLINA ELECTRIC&GAS CO's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

Line owner (most lines)SOUTH CAROLINA ELECTRIC&GAS CO
Coordinates33.6028, -81.6054

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#109809115 kVSOUTH CAROLINA ELECTRIC&GAS COIN SERVICE0.0 mi
#123900115 kVSOUTH CAROLINA ELECTRIC&GAS COIN SERVICE1.2 mi
#137322115 kVSOUTH CAROLINA ELECTRIC&GAS COIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP142266, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP142266 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN117189Substation-AdjacentSCAiken County230 kV300 MW3.9 yrs65.4
UNKNOWN120783Substation-AdjacentSCBarnwell County230 kV300 MW3.9 yrs64.2
Savannah River's Biomass Steam PlantBrownfieldSCAiken115 kV20 MW3.9 yrs64.0
UNKNOWN120772Substation-AdjacentSCRichmond County230 kV300 MW3.9 yrs64.0
UNKNOWN117128Substation-AdjacentSCSaluda County230 kV300 MW3.9 yrs63.9
UNKNOWN116730Substation-AdjacentSCSaluda County230 kV300 MW3.9 yrs63.8
UNKNOWN117346Substation-AdjacentSCAiken County230 kV300 MW3.9 yrs63.8
SOUTH AUGUSTASubstation-AdjacentGARichmond County230 kV300 MW5.8 yrs63.7

Who owns the transmission lines at TAP142266?

The 3 connected lines listed above are owned by SOUTH CAROLINA ELECTRIC&GAS CO. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 1.3 miles.

How do candidate sites near TAP142266 score?

The 8 highest-scoring candidate sites within about 25 miles range from 64 to 65 on the 0–100 DC Readiness scale. They fall in Aiken County, Barnwell County, Aiken, Richmond County. The South Carolina average across 2,061 scored sites is 57.1. 1,124 of those South Carolina sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP142266 substation?

TAP142266 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP142266 is at the national midpoint.

How many transmission lines connect to TAP142266 substation?

3 transmission lines terminate at or pass through TAP142266 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 1.3 miles.

Who owns TAP142266 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP142266 belong to SOUTH CAROLINA ELECTRIC&GAS CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP142266 substation located?

TAP142266 is in South Carolina at 33.6028, -81.6054. The datacenter candidate sites closest to it are in Aiken County, Barnwell County, Aiken.

Are there datacenter candidate sites near TAP142266 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP142266. The highest-scoring is UNKNOWN117189 at 65/100. Across South Carolina, the average DC Readiness score is 57.1.

More in South Carolina

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP142266 substation, South Carolina”, https://gridcensus.com/substations/south-carolina/tap142266-9ad9b238 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP142266 substation, South Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.