Skip to content
Gridcensus

TAP208724

Substation

Oregon · BONNEVILLE POWER ADMINISTRATION

Max voltage
69
kV

At a glance

TAP208724 is a 69 kV electric substation in Oregon on BONNEVILLE POWER ADMINISTRATION's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is ALVEY in Lane County, with a DC Readiness score of 69/100.

TAP208724 is an electric transmission substation in Oregon, on BONNEVILLE POWER ADMINISTRATION's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)BONNEVILLE POWER ADMINISTRATION
StateOregon
Coordinates44.1850, -123.2871

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#21059069 kVBONNEVILLE POWER ADMINISTRATION—5.2 mi
#21059169 kVBONNEVILLE POWER ADMINISTRATION—5.8 mi
#21059269 kVBONNEVILLE POWER ADMINISTRATION—2.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP208724, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP208724 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ALVEYSubstation-AdjacentORLane County500 kV1,000 MW3.5 yrs68.5
LANESubstation-AdjacentORLane County500 kV1,000 MW3.5 yrs68.1
UNKNOWN202116Substation-AdjacentORLane County230 kV300 MW3.5 yrs65.1
DEAD HEADSubstation-AdjacentORLane County230 kV300 MW3.5 yrs65.0
SeQuential Biodiesel SolarBrownfieldORLane115 kV0 MW3.5 yrs64.9
OZ LaneGreenfieldORLane——3.5 yrs64.9
TAP203154Substation-AdjacentORLane County230 kV300 MW3.5 yrs63.8
MCKENZIESubstation-AdjacentORLane County230 kV300 MW3.5 yrs63.0

Who owns the transmission lines at TAP208724?

The 3 connected lines listed above are owned by BONNEVILLE POWER ADMINISTRATION. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 13.5 miles.

How do candidate sites near TAP208724 score?

The 8 highest-scoring candidate sites within about 25 miles range from 63 to 69 on the 0–100 DC Readiness scale. They fall in Lane County, Lane. The Oregon average across 2,430 scored sites is 53.1. 844 of those Oregon sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP208724 substation?

TAP208724 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP208724 is below the national midpoint.

How many transmission lines connect to TAP208724 substation?

3 transmission lines terminate at or pass through TAP208724 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 13.5 miles.

Who owns TAP208724 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP208724 belong to BONNEVILLE POWER ADMINISTRATION. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP208724 substation located?

TAP208724 is in Oregon at 44.1850, -123.2871. The datacenter candidate sites closest to it are in Lane County, Lane.

Are there datacenter candidate sites near TAP208724 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP208724. The highest-scoring is ALVEY at 69/100. Across Oregon, the average DC Readiness score is 53.1.

More in Oregon

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP208724 substation, Oregon”, https://gridcensus.com/substations/oregon/tap208724-0b99d0c9 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP208724 substation, Oregon is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.