Skip to content
Gridcensus

TAP207360

Substation

Oregon · IDAHO POWER CO

Max voltage
115
kV

At a glance

TAP207360 is a 115 kV electric substation in Oregon on IDAHO POWER CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN202541 in Canyon County, with a DC Readiness score of 63/100.

TAP207360 is an electric transmission substation in Oregon, on IDAHO POWER CO's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

Line owner (most lines)IDAHO POWER CO
StateOregon
Coordinates44.0822, -116.9846

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#208507115 kVIDAHO POWER CO—2.7 mi
#208508115 kVIDAHO POWER CO—0.4 mi
#208509115 kVIDAHO POWER CO—3.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP207360, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP207360 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN202541Substation-AdjacentIDCanyon County230 kV300 MW5.0 yrs62.9
LANGLEYSubstation-AdjacentIDPayette County230 kV300 MW5.0 yrs60.0
EC FFE Payette CountyGreenfieldIDPayette County——5.0 yrs59.8
ONTARIOSubstation-AdjacentORPayette County230 kV300 MW3.5 yrs59.2
OZ CanyonGreenfieldIDCanyon——5.0 yrs58.4
WILISSubstation-AdjacentIDCanyon County138 kV100 MW5.0 yrs58.4
TAP204906Substation-AdjacentIDCanyon County138 kV100 MW5.0 yrs58.3
TAP207369Substation-AdjacentIDGem County230 kV300 MW5.0 yrs57.8

Who owns the transmission lines at TAP207360?

The 3 connected lines listed above are owned by IDAHO POWER CO. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 6.1 miles.

How do candidate sites near TAP207360 score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 63 on the 0–100 DC Readiness scale. They fall in Canyon County, Payette County, Canyon, Gem County. The Oregon average across 2,430 scored sites is 53.1. 844 of those Oregon sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP207360 substation?

TAP207360 has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP207360 is at the national midpoint.

How many transmission lines connect to TAP207360 substation?

3 transmission lines terminate at or pass through TAP207360 in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 6.1 miles.

Who owns TAP207360 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP207360 belong to IDAHO POWER CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP207360 substation located?

TAP207360 is in Oregon at 44.0822, -116.9846. The datacenter candidate sites closest to it are in Canyon County, Payette County, Canyon.

Are there datacenter candidate sites near TAP207360 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP207360. The highest-scoring is UNKNOWN202541 at 63/100. Across Oregon, the average DC Readiness score is 53.1.

More in Oregon

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP207360 substation, Oregon”, https://gridcensus.com/substations/oregon/tap207360-e725e2f4 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP207360 substation, Oregon is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.