TAP207165
SubstationOregon · DOUGLAS ELECTRIC COOP - (OR)
At a glance
TAP207165 is an electric transmission substation in Oregon, on DOUGLAS ELECTRIC COOP - (OR)'s transmission network. It is classified as distribution (69–115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #207933 | 69 kV | DOUGLAS ELECTRIC COOP - (OR) | — | 4.0 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP207165, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| ALVEY | Substation-Adjacent | OR | Lane County | 500 kV | 1,000 MW | 3.5 yrs | 68.5 |
| LANE | Substation-Adjacent | OR | Lane County | 500 kV | 1,000 MW | 3.5 yrs | 68.1 |
| UNKNOWN202116 | Substation-Adjacent | OR | Lane County | 230 kV | 300 MW | 3.5 yrs | 65.1 |
| DEAD HEAD | Substation-Adjacent | OR | Lane County | 230 kV | 300 MW | 3.5 yrs | 65.0 |
| OZ Lane | Greenfield | OR | Lane | — | — | 3.5 yrs | 64.9 |
| SeQuential Biodiesel Solar | Brownfield | OR | Lane | 115 kV | 0 MW | 3.5 yrs | 64.9 |
| TAP203154 | Substation-Adjacent | OR | Lane County | 230 kV | 300 MW | 3.5 yrs | 63.8 |
| MCKENZIE | Substation-Adjacent | OR | Lane County | 230 kV | 300 MW | 3.5 yrs | 63.0 |
Who owns the transmission lines at TAP207165?
The 1 connected line listed above is owned by DOUGLAS ELECTRIC COOP - (OR). Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 4 miles.
How do candidate sites near TAP207165 score?
The 8 highest-scoring candidate sites within about 25 miles range from 63 to 69 on the 0–100 DC Readiness scale. They fall in Lane County, Lane. The Oregon average across 2,430 scored sites is 53.1. 844 of those Oregon sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP207165 substation?
TAP207165 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP207165 is below the national midpoint.
How many transmission lines connect to TAP207165 substation?
1 transmission line terminate at or pass through TAP207165 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 4 miles.
Who owns TAP207165 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP207165 belong to DOUGLAS ELECTRIC COOP - (OR). GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP207165 substation located?
TAP207165 is in Oregon at 43.7012, -123.2778. The datacenter candidate sites closest to it are in Lane County, Lane.
Are there datacenter candidate sites near TAP207165 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP207165. The highest-scoring is ALVEY at 69/100. Across Oregon, the average DC Readiness score is 53.1.
More in Oregon
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP207165 substation, Oregon”, https://gridcensus.com/substations/oregon/tap207165-29293446 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP207165 substation, Oregon is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.