FORT ROCK

Substation

Oregon

Max voltage
500
kV

FORT ROCK is an electric transmission substation in Oregon. It is classified as extra-high-voltage (500 kv) and connects 6 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage500 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines6

Ownership & operation

Operator not catalogued for this substation.

StateOregon
Coordinates43.2435, -120.9202

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of FORT ROCK, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near FORT ROCK substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FORT ROCKSubstation-AdjacentORLake County500 kV1,000 MW6.9 yrs58.3
SUMMER LAKESubstation-AdjacentORLake County500 kV1,000 MW6.9 yrs57.5
SYCANSubstation-AdjacentORLake County500 kV1,000 MW6.9 yrs57.5
FORT ROCK (MIDSTATE)Substation-AdjacentORLake County115 kV100 MW6.9 yrs49.5
TAP208707Substation-AdjacentORLake County115 kV100 MW6.9 yrs48.7
South RegionFederal ExcessORLake County——6.9 yrs44.8
Mine SiteFormer MineORLake County——6.9 yrs44.0
Ole Turnbow ExxonIndustrialORLake County——6.9 yrs43.8

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for FORT ROCK substation, Oregon is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.