At a glance

TAP153610 is a 69 kV electric substation in Ohio on DAYTON POWER & LIGHT CO's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is SUGAR CREEK in Greene County, with a DC Readiness score of 67/100.

TAP153610 is an electric transmission substation in Ohio, on DAYTON POWER & LIGHT CO's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)DAYTON POWER & LIGHT CO
StateOhio
Coordinates39.4182, -83.7648

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#10400669 kVDAYTON POWER & LIGHT COIN SERVICE8.9 mi
#12408369 kVDAYTON POWER & LIGHT COIN SERVICE4.7 mi
#13447169 kVDAYTON POWER & LIGHT COIN SERVICE0.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP153610, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP153610 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
SUGAR CREEKSubstation-AdjacentOHGreene County345 kV600 MW5.2 yrs66.9
GREENESubstation-AdjacentOHGreene County345 kV600 MW5.2 yrs66.5
BATHSubstation-AdjacentOHGreene County345 kV600 MW5.2 yrs65.1
UNKNOWN113907Substation-AdjacentOHClinton County345 kV600 MW5.2 yrs64.9
OZ GreeneGreenfieldOHGreene——5.2 yrs63.8
UNKNOWN133804Substation-AdjacentOHBrown County345 kV600 MW5.2 yrs62.7
The National Center for Medical Readiness at Calamityville (GSHP)BrownfieldOHGreene69 kV—5.2 yrs62.0
EC FFE Clinton CountyGreenfieldOHClinton County——5.2 yrs61.6

Who owns the transmission lines at TAP153610?

The 3 connected lines listed above are owned by DAYTON POWER & LIGHT CO. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 13.6 miles.

How do candidate sites near TAP153610 score?

The 8 highest-scoring candidate sites within about 25 miles range from 62 to 67 on the 0–100 DC Readiness scale. They fall in Greene County, Clinton County, Greene, Brown County. The Ohio average across 3,933 scored sites is 54.8. 835 of those Ohio sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP153610 substation?

TAP153610 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP153610 is below the national midpoint.

How many transmission lines connect to TAP153610 substation?

3 transmission lines terminate at or pass through TAP153610 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 13.6 miles.

Who owns TAP153610 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP153610 belong to DAYTON POWER & LIGHT CO. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP153610 substation located?

TAP153610 is in Ohio at 39.4182, -83.7648. The datacenter candidate sites closest to it are in Greene County, Clinton County, Greene.

Are there datacenter candidate sites near TAP153610 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP153610. The highest-scoring is SUGAR CREEK at 67/100. Across Ohio, the average DC Readiness score is 54.8.

More in Ohio

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP153610 substation, Ohio”, https://gridcensus.com/substations/ohio/tap153610-b9cba980 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP153610 substation, Ohio is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.