Skip to content
Gridcensus

WOODLAWN

Substation

North Carolina · DUKE ENERGY CAROLINAS, LLC

Max voltage
230
kV

At a glance

WOODLAWN is a 230 kV electric substation in North Carolina on DUKE ENERGY CAROLINAS, LLC's transmission network, recorded in the HIFLD transmission dataset. 14 transmission lines connect to it. 10 of North Carolina's 106 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is NEWPORT TIE in York County, with a DC Readiness score of 72/100.

WOODLAWN is an electric transmission substation in North Carolina, on DUKE ENERGY CAROLINAS, LLC's transmission network. It is classified as high-voltage (230 kv) and connects 14 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage100 kV
Voltage classHigh-voltage (230 kV)
Connected lines14

Ownership

Line owner (most lines)DUKE ENERGY CAROLINAS, LLC
Coordinates35.1744, -80.8841

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#128785230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE8.5 mi
#142919230 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE8.5 mi
#116126100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.9 mi
#119065100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.3 mi
#127771100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.1 mi
#132114100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.3 mi
#132888100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.9 mi
#137791100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.0 mi
#140070100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.1 mi
#140395100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.8 mi
#144985100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE3.0 mi
#100105100 kVDUKE ENERGY CAROLINAS, LLCIN SERVICE2.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WOODLAWN, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WOODLAWN substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NEWPORT TIESubstation-AdjacentSCYork County500 kV1,000 MW3.9 yrs71.6
SediverBrownfieldSCYork County—520 MW3.9 yrs70.6
ALLENSubstation-AdjacentNCMecklenburg County230 kV300 MW5.3 yrs69.9
MCGUIRESubstation-AdjacentNCMecklenburg County500 kV1,000 MW5.3 yrs69.8
UNKNOWN112337Substation-AdjacentNCMecklenburg County230 kV300 MW5.3 yrs69.2
UNKNOWN114635Substation-AdjacentNCMecklenburg County230 kV300 MW5.3 yrs67.3
WOODLAWNSubstation-AdjacentNCMecklenburg County230 kV300 MW5.3 yrs67.3
CATAWBA 230KV SWITCHING STATIONSubstation-AdjacentSCYork County230 kV300 MW3.9 yrs67.0

How does WOODLAWN compare with other substations in North Carolina?

North Carolina has 3,209 substation records in HIFLD, of which 106 carry a station name; the rest are unnamed tap points, risers and line ends. 54 named substations in the state are in WOODLAWN's 230–344 kV band (51% of named stations). 10 sit in a higher band. 10 named substations in North Carolina operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 230 kV.

Who owns the transmission lines at WOODLAWN?

The 12 connected lines listed above are owned by DUKE ENERGY CAROLINAS, LLC. Line voltages range from 100 kV to 230 kV. Their combined recorded length is about 47.3 miles.

How do candidate sites near WOODLAWN score?

The 8 highest-scoring candidate sites within about 25 miles range from 67 to 72 on the 0–100 DC Readiness scale. They fall in York County, Mecklenburg County. The North Carolina average across 2,778 scored sites is 55.1. 1,087 of those North Carolina sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is WOODLAWN substation?

WOODLAWN has a maximum voltage of 230 kV and a minimum of 100 kV. That places it in the 230–344 kV band. The median named US substation in this dataset is 115 kV, so WOODLAWN is above the national midpoint.

How many transmission lines connect to WOODLAWN substation?

14 transmission lines terminate at or pass through WOODLAWN in the HIFLD line data. The connected lines listed here run at 230 kV, 100 kV. Together the listed lines cover about 47.3 miles.

Who owns WOODLAWN substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at WOODLAWN belong to DUKE ENERGY CAROLINAS, LLC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is WOODLAWN substation located?

WOODLAWN is in North Carolina at 35.1744, -80.8841. The datacenter candidate sites closest to it are in York County, Mecklenburg County.

Are there datacenter candidate sites near WOODLAWN substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of WOODLAWN. The highest-scoring is NEWPORT TIE at 72/100. Across North Carolina, the average DC Readiness score is 55.1.

Other 230 kV substations in North Carolina

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “WOODLAWN substation, North Carolina”, https://gridcensus.com/substations/north-carolina/woodlawn-a808709d (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for WOODLAWN substation, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.