TAP169911
SubstationNorth Carolina · DUKE ENERGY CAROLINAS, LLC
At a glance
TAP169911 is an electric transmission substation in North Carolina, on DUKE ENERGY CAROLINAS, LLC's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #168069 | 100 kV | DUKE ENERGY CAROLINAS, LLC | IN SERVICE | 1.7 mi |
| #171704 | 100 kV | — | — | 0.4 mi |
| #171705 | 100 kV | — | IN SERVICE | 0.1 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP169911, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| MCGUIRE | Substation-Adjacent | NC | Mecklenburg County | 500 kV | 1,000 MW | 5.3 yrs | 69.8 |
| UNKNOWN112337 | Substation-Adjacent | NC | Mecklenburg County | 230 kV | 300 MW | 5.3 yrs | 69.2 |
| WOODLEAF SWITCHING STATION | Substation-Adjacent | NC | Rowan County | 500 kV | 1,000 MW | 5.3 yrs | 68.6 |
| UNKNOWN114701 | Substation-Adjacent | NC | Rowan County | 230 kV | 300 MW | 5.3 yrs | 66.4 |
| UNKNOWN114253 | Substation-Adjacent | NC | Mecklenburg County | 230 kV | 300 MW | 5.3 yrs | 66.2 |
| UNKNOWN114573 | Substation-Adjacent | NC | Cabarrus County | 230 kV | 300 MW | 5.3 yrs | 66.0 |
| OZ Cabarrus | Greenfield | NC | Cabarrus | — | — | 5.3 yrs | 64.8 |
| OZ Rowan | Greenfield | NC | Rowan | — | — | 5.3 yrs | 63.6 |
Who owns the transmission lines at TAP169911?
The 3 connected lines listed above are owned by DUKE ENERGY CAROLINAS, LLC. Line voltages range from 100 kV to 100 kV. Their combined recorded length is about 2.2 miles.
How do candidate sites near TAP169911 score?
The 8 highest-scoring candidate sites within about 25 miles range from 64 to 70 on the 0–100 DC Readiness scale. They fall in Mecklenburg County, Rowan County, Cabarrus County, Cabarrus. The North Carolina average across 2,778 scored sites is 55.1. 1,087 of those North Carolina sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP169911 substation?
TAP169911 has a maximum voltage of 100 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP169911 is below the national midpoint.
How many transmission lines connect to TAP169911 substation?
3 transmission lines terminate at or pass through TAP169911 in the HIFLD line data. The connected lines listed here run at 100 kV. Together the listed lines cover about 2.2 miles.
Who owns TAP169911 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP169911 belong to DUKE ENERGY CAROLINAS, LLC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP169911 substation located?
TAP169911 is in North Carolina at 35.7136, -80.6069. The datacenter candidate sites closest to it are in Mecklenburg County, Rowan County, Cabarrus County.
Are there datacenter candidate sites near TAP169911 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP169911. The highest-scoring is MCGUIRE at 70/100. Across North Carolina, the average DC Readiness score is 55.1.
More in North Carolina
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP169911 substation, North Carolina”, https://gridcensus.com/substations/north-carolina/tap169911-1f619295 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP169911 substation, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.