TAP169691 is an electric substation in North Carolina, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is WOODLEAF SWITCHING STATION in Rowan County, with a DC Readiness score of 69/100.

TAP169691 is an electric transmission substation in North Carolina. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

No owner is recorded for the lines that connect here.

Coordinates35.9563, -80.6063

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#171468——IN SERVICE4.3 mi
#171469——IN SERVICE4.2 mi
#171470——IN SERVICE0.9 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP169691, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP169691 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WOODLEAF SWITCHING STATIONSubstation-AdjacentNCRowan County500 kV1,000 MW5.3 yrs68.6
UNKNOWN114701Substation-AdjacentNCRowan County230 kV300 MW5.3 yrs66.4
OZ RowanGreenfieldNCRowan——5.3 yrs63.6
MITCHELL RIVERSubstation-AdjacentNCYadkin County230 kV300 MW5.3 yrs62.3
STAMEYSubstation-AdjacentNCIredell County230 kV300 MW5.3 yrs62.2
EC Near BuckGreenfieldNCRowan——5.3 yrs62.1
MARSHALL STEAM STATIONSubstation-AdjacentNCCatawba County230 kV300 MW5.3 yrs62.1
UNKNOWN114916Substation-AdjacentNCForsyth County230 kV300 MW5.3 yrs61.5

How do candidate sites near TAP169691 score?

The 8 highest-scoring candidate sites within about 25 miles range from 62 to 69 on the 0–100 DC Readiness scale. They fall in Rowan County, Rowan, Yadkin County, Iredell County. The North Carolina average across 2,778 scored sites is 55.1. 1,087 of those North Carolina sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP169691 substation?

3 transmission lines terminate at or pass through TAP169691 in the HIFLD line data. Together the listed lines cover about 9.4 miles.

Where is TAP169691 substation located?

TAP169691 is in North Carolina at 35.9563, -80.6063. The datacenter candidate sites closest to it are in Rowan County, Rowan, Yadkin County.

Are there datacenter candidate sites near TAP169691 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP169691. The highest-scoring is WOODLEAF SWITCHING STATION at 69/100. Across North Carolina, the average DC Readiness score is 55.1.

More in North Carolina

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP169691 substation, North Carolina”, https://gridcensus.com/substations/north-carolina/tap169691-363391b0 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP169691 substation, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.