TAP150312

Substation

North Carolina

Max voltage
—
kV

At a glance

TAP150312 is an electric substation in North Carolina, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is NEWPORT TIE in York County, with a DC Readiness score of 72/100.

TAP150312 is an electric transmission substation in North Carolina. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

No owner is recorded for the lines that connect here.

Coordinates35.3688, -81.1068

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#105441100 kV—IN SERVICE0.0 mi
#131570100 kV—IN SERVICE2.4 mi
#147643100 kV—IN SERVICE8.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP150312, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP150312 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NEWPORT TIESubstation-AdjacentSCYork County500 kV1,000 MW3.9 yrs71.6
ALLENSubstation-AdjacentNCMecklenburg County230 kV300 MW5.3 yrs69.9
MCGUIRESubstation-AdjacentNCMecklenburg County500 kV1,000 MW5.3 yrs69.8
UNKNOWN112337Substation-AdjacentNCMecklenburg County230 kV300 MW5.3 yrs69.2
UNKNOWN133860Substation-AdjacentNCCherokee County230 kV300 MW5.3 yrs68.0
WOODLAWNSubstation-AdjacentNCMecklenburg County230 kV300 MW5.3 yrs67.3
UNKNOWN114635Substation-AdjacentNCMecklenburg County230 kV300 MW5.3 yrs67.3
TAP150276Substation-AdjacentSCYork County230 kV300 MW3.9 yrs67.0

How do candidate sites near TAP150312 score?

The 8 highest-scoring candidate sites within about 25 miles range from 67 to 72 on the 0–100 DC Readiness scale. They fall in York County, Mecklenburg County, Cherokee County. The North Carolina average across 2,778 scored sites is 55.1. 1,087 of those North Carolina sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP150312 substation?

3 transmission lines terminate at or pass through TAP150312 in the HIFLD line data. The connected lines listed here run at 100 kV. Together the listed lines cover about 10.9 miles.

Where is TAP150312 substation located?

TAP150312 is in North Carolina at 35.3688, -81.1068. The datacenter candidate sites closest to it are in York County, Mecklenburg County, Cherokee County.

Are there datacenter candidate sites near TAP150312 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP150312. The highest-scoring is NEWPORT TIE at 72/100. Across North Carolina, the average DC Readiness score is 55.1.

More in North Carolina

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP150312 substation, North Carolina”, https://gridcensus.com/substations/north-carolina/tap150312-743e6cc2 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP150312 substation, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.