TAP148247
SubstationNorth Carolina · DUKE ENERGY PROGRESS - (NC)
At a glance
TAP148247 is an electric transmission substation in North Carolina, on DUKE ENERGY PROGRESS - (NC)'s transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #107481 | — | — | IN SERVICE | 9.5 mi |
| #134631 | — | DUKE ENERGY PROGRESS - (NC) | IN SERVICE | 0.0 mi |
| #145031 | — | DUKE ENERGY PROGRESS - (NC) | IN SERVICE | 3.5 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP148247, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| UNKNOWN158081 | Substation-Adjacent | NC | Edgecombe County | 230 kV | 300 MW | 5.3 yrs | 61.7 |
| UNKNOWN111937 | Substation-Adjacent | NC | Edgecombe County | 230 kV | 300 MW | 5.3 yrs | 61.7 |
| TAP146977 | Substation-Adjacent | NC | Edgecombe County | 230 kV | 300 MW | 5.3 yrs | 61.6 |
| OZ Edgecombe | Greenfield | NC | Edgecombe | — | — | 5.3 yrs | 60.1 |
| UNKNOWN111421 | Substation-Adjacent | NC | Greensville County | 230 kV | 300 MW | 5.3 yrs | 59.4 |
| OZ Edgecombe | Greenfield | NC | Edgecombe | — | — | 5.3 yrs | 58.2 |
| OZ Edgecombe | Greenfield | NC | Edgecombe | — | — | 5.3 yrs | 58.2 |
| UNKNOWN111931 | Substation-Adjacent | NC | Edgecombe County | 230 kV | 300 MW | 5.3 yrs | 58.1 |
Who owns the transmission lines at TAP148247?
The 3 connected lines listed above are owned by DUKE ENERGY PROGRESS - (NC). Their combined recorded length is about 13 miles.
How do candidate sites near TAP148247 score?
The 8 highest-scoring candidate sites within about 25 miles range from 58 to 62 on the 0–100 DC Readiness scale. They fall in Edgecombe County, Edgecombe, Greensville County. The North Carolina average across 2,778 scored sites is 55.1. 1,087 of those North Carolina sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
How many transmission lines connect to TAP148247 substation?
3 transmission lines terminate at or pass through TAP148247 in the HIFLD line data. Together the listed lines cover about 13 miles.
Who owns TAP148247 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP148247 belong to DUKE ENERGY PROGRESS - (NC). GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP148247 substation located?
TAP148247 is in North Carolina at 36.1040, -77.3649. The datacenter candidate sites closest to it are in Edgecombe County, Edgecombe, Greensville County.
Are there datacenter candidate sites near TAP148247 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP148247. The highest-scoring is UNKNOWN158081 at 62/100. Across North Carolina, the average DC Readiness score is 55.1.
More in North Carolina
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP148247 substation, North Carolina”, https://gridcensus.com/substations/north-carolina/tap148247-914b9229 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP148247 substation, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.