TAP145906
SubstationNorth Carolina
At a glance
TAP145906 is an electric transmission substation in North Carolina. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
No owner is recorded for the lines that connect here.
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #131428 | 161 kV | — | IN SERVICE | 2.9 mi |
| #136023 | 161 kV | — | IN SERVICE | 0.7 mi |
| #137631 | 161 kV | — | IN SERVICE | 7.6 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP145906, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| TUCKASEGEE TIE | Substation-Adjacent | NC | Jackson County | 230 kV | 300 MW | 5.3 yrs | 63.6 |
| TAP145904 | Substation-Adjacent | NC | Jackson County | 161 kV | 100 MW | 5.3 yrs | 62.2 |
| UNKNOWN110046 | Substation-Adjacent | NC | Jackson County | 161 kV | 100 MW | 5.3 yrs | 62.2 |
| UNKNOWN110047 | Substation-Adjacent | NC | Jackson County | 161 kV | 100 MW | 5.3 yrs | 62.2 |
| WEBSTER TIE | Substation-Adjacent | NC | Jackson County | 161 kV | 100 MW | 5.3 yrs | 62.0 |
| UNKNOWN169765 | Substation-Adjacent | NC | Jackson County | 161 kV | 100 MW | 5.3 yrs | 61.7 |
| TAP169766 | Substation-Adjacent | NC | Jackson County | 161 kV | 100 MW | 5.3 yrs | 60.8 |
| UNKNOWN110049 | Substation-Adjacent | NC | Swain County | 161 kV | 100 MW | 5.3 yrs | 60.5 |
How do candidate sites near TAP145906 score?
The 8 highest-scoring candidate sites within about 25 miles range from 61 to 64 on the 0–100 DC Readiness scale. They fall in Jackson County, Swain County. The North Carolina average across 2,778 scored sites is 55.1. 1,087 of those North Carolina sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP145906 substation?
TAP145906 has a maximum voltage of 161 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so TAP145906 is above the national midpoint.
How many transmission lines connect to TAP145906 substation?
3 transmission lines terminate at or pass through TAP145906 in the HIFLD line data. The connected lines listed here run at 161 kV. Together the listed lines cover about 11.1 miles.
Where is TAP145906 substation located?
TAP145906 is in North Carolina at 35.4165, -83.3343. The datacenter candidate sites closest to it are in Jackson County, Swain County.
Are there datacenter candidate sites near TAP145906 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP145906. The highest-scoring is TUCKASEGEE TIE at 64/100. Across North Carolina, the average DC Readiness score is 55.1.
More in North Carolina
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP145906 substation, North Carolina”, https://gridcensus.com/substations/north-carolina/tap145906-cdfbd345 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP145906 substation, North Carolina is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.