TAP144095 is an electric substation in New York on ROCHESTER GAS & ELECTRIC CORP's transmission network, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. The highest-scoring datacenter candidate site within about 25 miles is ROCHESTER #80 in Monroe County, with a DC Readiness score of 66/100.

TAP144095 is an electric transmission substation in New York, on ROCHESTER GAS & ELECTRIC CORP's transmission network. It is classified as unclassified and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines1

Ownership

Line owner (most lines)ROCHESTER GAS & ELECTRIC CORP
Coordinates43.1771, -77.5320

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#156994—ROCHESTER GAS & ELECTRIC CORPIN SERVICE0.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP144095, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP144095 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROCHESTER #80Substation-AdjacentNYMonroe County345 kV600 MW4.3 yrs65.6
PANNELLSubstation-AdjacentNYOntario County345 kV600 MW4.3 yrs65.4
City of Canandaigua - Phase IBrownfieldNYOntario—2 MW4.3 yrs63.0
UNKNOWN124706Substation-AdjacentNYMonroe County115 kV100 MW4.3 yrs62.3
RED-Rochester, LLCBrownfieldNYMonroe County—89 MW4.3 yrs61.8
UNKNOWN124708Substation-AdjacentNYMonroe County115 kV100 MW4.3 yrs61.8
OZ MonroeGreenfieldNYMonroe——4.3 yrs61.5
EC Near Rochester 3GreenfieldNYMonroe——4.3 yrs61.3

Who owns the transmission lines at TAP144095?

The 1 connected line listed above is owned by ROCHESTER GAS & ELECTRIC CORP. Their combined recorded length is about 0.3 miles.

How do candidate sites near TAP144095 score?

The 8 highest-scoring candidate sites within about 25 miles range from 61 to 66 on the 0–100 DC Readiness scale. They fall in Monroe County, Ontario County, Ontario, Monroe. The New York average across 2,980 scored sites is 54. 844 of those New York sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP144095 substation?

1 transmission line terminate at or pass through TAP144095 in the HIFLD line data. Together the listed lines cover about 0.3 miles.

Who owns TAP144095 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP144095 belong to ROCHESTER GAS & ELECTRIC CORP. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP144095 substation located?

TAP144095 is in New York at 43.1771, -77.5320. The datacenter candidate sites closest to it are in Monroe County, Ontario County, Ontario.

Are there datacenter candidate sites near TAP144095 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP144095. The highest-scoring is ROCHESTER #80 at 66/100. Across New York, the average DC Readiness score is 54.

More in New York

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP144095 substation, New York”, https://gridcensus.com/substations/new-york/tap144095-d4020b21 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP144095 substation, New York is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.