TAP143735 is an electric substation in New York on NIAGARA MOHAWK POWER CORP.'s transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is ROTTERDAM in Schenectady County, with a DC Readiness score of 63/100.

TAP143735 is an electric transmission substation in New York, on NIAGARA MOHAWK POWER CORP.'s transmission network. It is classified as unclassified and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines3

Ownership

Line owner (most lines)NIAGARA MOHAWK POWER CORP.
Coordinates43.0453, -74.3783

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#120094—NIAGARA MOHAWK POWER CORP.IN SERVICE0.3 mi
#125146—NIAGARA MOHAWK POWER CORP.IN SERVICE1.6 mi
#148856—NIAGARA MOHAWK POWER CORP.IN SERVICE2.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP143735, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP143735 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
ROTTERDAMSubstation-AdjacentNYSchenectady County230 kV300 MW4.3 yrs63.3
TAP135869Substation-AdjacentNYSchenectady County115 kV100 MW4.3 yrs59.2
TAP135822Substation-AdjacentNYSchenectady County115 kV100 MW4.3 yrs59.1
Gloversville LandfillBrownfieldNYFulton—5 MW4.3 yrs58.8
Greenfield (NEW SCOTLAND - MARCY)GreenfieldNYSchenectady County345 kV600 MW4.3 yrs58.7
Greenfield (NEW SCOTLAND - MARCY)GreenfieldNYSchenectady County345 kV600 MW4.3 yrs57.1
OZ MontgomeryGreenfieldNYMontgomery——4.3 yrs57.1
UNKNOWN127908Substation-AdjacentNYSchenectady County115 kV100 MW4.3 yrs57.1

Who owns the transmission lines at TAP143735?

The 3 connected lines listed above are owned by NIAGARA MOHAWK POWER CORP. Their combined recorded length is about 4.3 miles.

How do candidate sites near TAP143735 score?

The 8 highest-scoring candidate sites within about 25 miles range from 57 to 63 on the 0–100 DC Readiness scale. They fall in Schenectady County, Fulton, Montgomery. The New York average across 2,980 scored sites is 54. 844 of those New York sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

How many transmission lines connect to TAP143735 substation?

3 transmission lines terminate at or pass through TAP143735 in the HIFLD line data. Together the listed lines cover about 4.3 miles.

Who owns TAP143735 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP143735 belong to NIAGARA MOHAWK POWER CORP. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP143735 substation located?

TAP143735 is in New York at 43.0453, -74.3783. The datacenter candidate sites closest to it are in Schenectady County, Fulton, Montgomery.

Are there datacenter candidate sites near TAP143735 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP143735. The highest-scoring is ROTTERDAM at 63/100. Across New York, the average DC Readiness score is 54.

More in New York

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP143735 substation, New York”, https://gridcensus.com/substations/new-york/tap143735-458c829b (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP143735 substation, New York is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.