Skip to content
Gridcensus

TAP307942

Substation

New Mexico · XCEL ENERGY

Max voltage
69
kV

At a glance

TAP307942 is a 69 kV electric substation in New Mexico on XCEL ENERGY's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. The highest-scoring datacenter candidate site within about 25 miles is UNKNOWN307140 in Eddy County, with a DC Readiness score of 58/100.

TAP307942 is an electric transmission substation in New Mexico, on XCEL ENERGY's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage69 kV
Min voltage69 kV
Voltage classDistribution (69–115 kV)
Connected lines3

Ownership

Line owner (most lines)XCEL ENERGY
Coordinates32.3045, -104.2378

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#30367369 kVXCEL ENERGYIN SERVICE13.2 mi
#30908869 kVSOUTHWEST PUBLIC SERVICE COMPANYIN SERVICE1.8 mi
#31310169 kVXCEL ENERGYIN SERVICE6.4 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP307942, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP307942 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN307140Substation-AdjacentNMEddy County345 kV600 MW4.3 yrs58.2
UNKNOWN306969Substation-AdjacentNMEddy County230 kV300 MW4.3 yrs56.5
POTASH JUNCTIONSubstation-AdjacentNMEddy County230 kV300 MW4.3 yrs56.4
EC Near CarlsbadGreenfieldNMEddy——4.3 yrs56.0
UNKNOWN305514Substation-AdjacentNMEddy County230 kV300 MW4.3 yrs56.0
OZ EddyGreenfieldNMEddy——4.3 yrs55.6
EC Near CarlsbadGreenfieldNMEddy——4.3 yrs55.5
EC Near CarlsbadGreenfieldNMEddy——4.3 yrs55.4

Who owns the transmission lines at TAP307942?

The 3 connected lines listed above are owned by XCEL ENERGY, SOUTHWEST PUBLIC SERVICE COMPANY. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 21.3 miles.

How do candidate sites near TAP307942 score?

The 8 highest-scoring candidate sites within about 25 miles range from 55 to 58 on the 0–100 DC Readiness scale. They fall in Eddy County, Eddy. The New Mexico average across 1,535 scored sites is 47.8. 445 of those New Mexico sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is TAP307942 substation?

TAP307942 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP307942 is below the national midpoint.

How many transmission lines connect to TAP307942 substation?

3 transmission lines terminate at or pass through TAP307942 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 21.3 miles.

Who owns TAP307942 substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP307942 belong to XCEL ENERGY, and others to SOUTHWEST PUBLIC SERVICE COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is TAP307942 substation located?

TAP307942 is in New Mexico at 32.3045, -104.2378. The datacenter candidate sites closest to it are in Eddy County, Eddy.

Are there datacenter candidate sites near TAP307942 substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP307942. The highest-scoring is UNKNOWN307140 at 58/100. Across New Mexico, the average DC Readiness score is 47.8.

More in New Mexico

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “TAP307942 substation, New Mexico”, https://gridcensus.com/substations/new-mexico/tap307942-2bc0a5ea (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP307942 substation, New Mexico is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.