Skip to content
Gridcensus

PRUITT ESCALANTE (PEGS)

Substation

New Mexico · NAVAJO TRIBAL UTILITY AUTHORITY

Max voltage
115
kV

At a glance

PRUITT ESCALANTE (PEGS) is a 115 kV electric substation in New Mexico on NAVAJO TRIBAL UTILITY AUTHORITY's transmission network, recorded in the HIFLD transmission dataset. 4 transmission lines connect to it. 34 of New Mexico's 387 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is EC Near Escalante in McKinley, with a DC Readiness score of 54/100.

PRUITT ESCALANTE (PEGS) is an electric transmission substation in New Mexico, on NAVAJO TRIBAL UTILITY AUTHORITY's transmission network. It is classified as sub-transmission (115 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines4

Ownership

Line owner (most lines)NAVAJO TRIBAL UTILITY AUTHORITY
Coordinates35.4160, -108.0872

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#312840230 kV—IN SERVICE14.5 mi
#303065115 kV—IN SERVICE24.0 mi
#304352115 kVNAVAJO TRIBAL UTILITY AUTHORITY—0.2 mi
#306538115 kV—IN SERVICE15.7 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PRUITT ESCALANTE (PEGS), ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PRUITT ESCALANTE (PEGS) substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
EC Near EscalanteGreenfieldNMMcKinley——3.5 yrs54.0
EC Near EscalanteGreenfieldNMMcKinley——3.5 yrs53.9
AMBROSIASubstation-AdjacentNMMcKinley County230 kV300 MW3.5 yrs53.8
EC Near EscalanteGreenfieldNMMcKinley——3.5 yrs53.7
EC Coal McKinley CountyGreenfieldNMMcKinley County——3.5 yrs53.2
EC Near EscalanteGreenfieldNMMcKinley——3.5 yrs53.2
EC Near EscalanteGreenfieldNMMcKinley——3.5 yrs53.1
SEVEN LAKESSubstation-AdjacentNMMcKinley County230 kV300 MW3.5 yrs53.1

How does PRUITT ESCALANTE (PEGS) compare with other substations in New Mexico?

New Mexico has 619 substation records in HIFLD, of which 387 carry a station name; the rest are unnamed tap points, risers and line ends. 248 named substations in the state are in PRUITT ESCALANTE (PEGS)'s 115–229 kV band (64% of named stations). 34 sit in a higher band. 24 named substations in New Mexico operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 115 kV.

Who owns the transmission lines at PRUITT ESCALANTE (PEGS)?

The 4 connected lines listed above are owned by NAVAJO TRIBAL UTILITY AUTHORITY. Line voltages range from 115 kV to 230 kV. Their combined recorded length is about 54.4 miles.

How do candidate sites near PRUITT ESCALANTE (PEGS) score?

The 8 highest-scoring candidate sites within about 25 miles range from 53 to 54 on the 0–100 DC Readiness scale. They fall in McKinley, McKinley County. The New Mexico average across 1,535 scored sites is 47.8. 445 of those New Mexico sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is PRUITT ESCALANTE (PEGS) substation?

PRUITT ESCALANTE (PEGS) has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so PRUITT ESCALANTE (PEGS) is at the national midpoint.

How many transmission lines connect to PRUITT ESCALANTE (PEGS) substation?

4 transmission lines terminate at or pass through PRUITT ESCALANTE (PEGS) in the HIFLD line data. The connected lines listed here run at 230 kV, 115 kV. Together the listed lines cover about 54.4 miles.

Who owns PRUITT ESCALANTE (PEGS) substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at PRUITT ESCALANTE (PEGS) belong to NAVAJO TRIBAL UTILITY AUTHORITY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is PRUITT ESCALANTE (PEGS) substation located?

PRUITT ESCALANTE (PEGS) is in New Mexico at 35.4160, -108.0872. The datacenter candidate sites closest to it are in McKinley, McKinley County.

Are there datacenter candidate sites near PRUITT ESCALANTE (PEGS) substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of PRUITT ESCALANTE (PEGS). The highest-scoring is EC Near Escalante at 54/100. Across New Mexico, the average DC Readiness score is 47.8.

Other 115 kV substations in New Mexico

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “PRUITT ESCALANTE (PEGS) substation, New Mexico”, https://gridcensus.com/substations/new-mexico/pruitt-escalante-pegs-6e1ba22c (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for PRUITT ESCALANTE (PEGS) substation, New Mexico is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.