ANTHONY

Substation

New Mexico

Max voltage
115
kV

ANTHONY is an electric transmission substation in New Mexico. It is classified as sub-transmission (115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines5

Ownership & operation

Operator not catalogued for this substation.

Coordinates32.0242, -106.6020

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ANTHONY, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ANTHONY substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
TurbineBrownfieldTXEl Paso115 kV121 MW1.7 yrs66.2
OZ El PasoGreenfieldTXEl Paso3.4 yrs64.6
OZ El PasoGreenfieldTXEl Paso3.4 yrs64.5
CALIENTESubstation-AdjacentTXEl Paso County345 kV600 MW1.7 yrs62.8
PICANTESubstation-AdjacentTXEl Paso County345 kV600 MW1.7 yrs62.2
BLM Solar DLA: AftonGreenfieldNMDoña Ana County5,000 MW3.5 yrs61.0
OZ El PasoGreenfieldTXEl Paso3.4 yrs60.1
OZ Doña AnaGreenfieldNMDoña Ana3.5 yrs60.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for ANTHONY substation, New Mexico. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.