PROGRESS STATION

Substation

New Mexico

Max voltage
115
kV

At a glance

PROGRESS STATION is a 115 kV electric substation in New Mexico, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. 34 of New Mexico's 387 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is Emcore Eubank Landfill in Bernalillo, with a DC Readiness score of 63/100.

PROGRESS STATION is an electric transmission substation in New Mexico. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership

No owner is recorded for the lines that connect here.

Coordinates35.3269, -106.7093

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#304549115 kV—IN SERVICE6.0 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of PROGRESS STATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near PROGRESS STATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Emcore Eubank LandfillBrownfieldNMBernalillo115 kV2 MW3.5 yrs62.9
SANDIASubstation-AdjacentNMBernalillo County345 kV600 MW3.5 yrs61.7
WEST MESASubstation-AdjacentNMBernalillo County345 kV600 MW3.5 yrs61.3
EC Near Univ New Mexico Cogen PlantGreenfieldNMBernalillo——3.5 yrs61.2
EC Near Univ New Mexico Cogen PlantGreenfieldNMBernalillo——3.5 yrs60.6
B-ASubstation-AdjacentNMBernalillo County345 kV600 MW3.5 yrs59.2
OZ BernalilloGreenfieldNMBernalillo——3.5 yrs58.5
RIO PUERCOSubstation-AdjacentNMBernalillo County345 kV600 MW3.5 yrs57.8

How does PROGRESS STATION compare with other substations in New Mexico?

New Mexico has 619 substation records in HIFLD, of which 387 carry a station name; the rest are unnamed tap points, risers and line ends. 248 named substations in the state are in PROGRESS STATION's 115–229 kV band (64% of named stations). 34 sit in a higher band. 24 named substations in New Mexico operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 115 kV.

How do candidate sites near PROGRESS STATION score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 63 on the 0–100 DC Readiness scale. They fall in Bernalillo, Bernalillo County. The New Mexico average across 1,535 scored sites is 47.8. 445 of those New Mexico sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is PROGRESS STATION substation?

PROGRESS STATION has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so PROGRESS STATION is at the national midpoint.

How many transmission lines connect to PROGRESS STATION substation?

1 transmission line terminate at or pass through PROGRESS STATION in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 6 miles.

Where is PROGRESS STATION substation located?

PROGRESS STATION is in New Mexico at 35.3269, -106.7093. The datacenter candidate sites closest to it are in Bernalillo, Bernalillo County.

Are there datacenter candidate sites near PROGRESS STATION substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of PROGRESS STATION. The highest-scoring is Emcore Eubank Landfill at 63/100. Across New Mexico, the average DC Readiness score is 47.8.

Other 115 kV substations in New Mexico

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “PROGRESS STATION substation, New Mexico”, https://gridcensus.com/substations/new-mexico/progress-station-858780cd (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for PROGRESS STATION substation, New Mexico is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.