At a glance

ORO GRANDE is a 115 kV electric substation in New Mexico on EL PASO ELECTRIC POWER COMPANY's transmission network, recorded in the HIFLD transmission dataset. 5 transmission lines connect to it. 34 of New Mexico's 387 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is AMRAD in Otero County, with a DC Readiness score of 58/100.

ORO GRANDE is an electric transmission substation in New Mexico, on EL PASO ELECTRIC POWER COMPANY's transmission network. It is classified as sub-transmission (115 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines5

Ownership

Line owner (most lines)EL PASO ELECTRIC POWER COMPANY
Coordinates32.4056, -106.1418

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#303197115 kV——3.5 mi
#303816115 kVEL PASO ELECTRIC POWER COMPANY—15.0 mi
#306406115 kVEL PASO ELECTRIC POWER COMPANY—9.7 mi
#310217115 kVEL PASO ELECTRIC POWER COMPANY—0.1 mi
#310357115 kV——35.5 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ORO GRANDE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ORO GRANDE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
AMRADSubstation-AdjacentNMOtero County345 kV600 MW3.5 yrs58.0
JARILLASubstation-AdjacentNMOtero County115 kV100 MW3.5 yrs52.3
WHITE SANDS MISSILE RANGESubstation-AdjacentNMDoña Ana County115 kV100 MW3.5 yrs52.1
ORO GRANDESubstation-AdjacentNMOtero County115 kV100 MW3.5 yrs52.0
UNKNOWN307767Substation-AdjacentNMDoña Ana County115 kV100 MW3.5 yrs51.8
LARGOSubstation-AdjacentNMOtero County115 kV100 MW3.5 yrs51.6
UNKNOWN301436Substation-AdjacentNMEl Paso County69 kV50 MW3.5 yrs51.4
MARSubstation-AdjacentNMOtero County115 kV100 MW3.5 yrs50.7

How does ORO GRANDE compare with other substations in New Mexico?

New Mexico has 619 substation records in HIFLD, of which 387 carry a station name; the rest are unnamed tap points, risers and line ends. 248 named substations in the state are in ORO GRANDE's 115–229 kV band (64% of named stations). 34 sit in a higher band. 24 named substations in New Mexico operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 115 kV.

Who owns the transmission lines at ORO GRANDE?

The 5 connected lines listed above are owned by EL PASO ELECTRIC POWER COMPANY. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 63.8 miles.

How do candidate sites near ORO GRANDE score?

The 8 highest-scoring candidate sites within about 25 miles range from 51 to 58 on the 0–100 DC Readiness scale. They fall in Otero County, Doña Ana County, El Paso County. The New Mexico average across 1,535 scored sites is 47.8. 445 of those New Mexico sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is ORO GRANDE substation?

ORO GRANDE has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so ORO GRANDE is at the national midpoint.

How many transmission lines connect to ORO GRANDE substation?

5 transmission lines terminate at or pass through ORO GRANDE in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 63.8 miles.

Who owns ORO GRANDE substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at ORO GRANDE belong to EL PASO ELECTRIC POWER COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is ORO GRANDE substation located?

ORO GRANDE is in New Mexico at 32.4056, -106.1418. The datacenter candidate sites closest to it are in Otero County, Doña Ana County, El Paso County.

Are there datacenter candidate sites near ORO GRANDE substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of ORO GRANDE. The highest-scoring is AMRAD at 58/100. Across New Mexico, the average DC Readiness score is 47.8.

Other 115 kV substations in New Mexico

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “ORO GRANDE substation, New Mexico”, https://gridcensus.com/substations/new-mexico/oro-grande-0a94e604 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for ORO GRANDE substation, New Mexico is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.