Skip to content
Gridcensus

MEJIA

Substation

New Mexico

Max voltage
115
kV

At a glance

MEJIA is a 115 kV electric substation in New Mexico, recorded in the HIFLD transmission dataset. 1 transmission line connect to it. 34 of New Mexico's 387 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is OZ Santa Fe in Santa Fe, with a DC Readiness score of 57/100.

MEJIA is an electric transmission substation in New Mexico. It is classified as sub-transmission (115 kv) and connects 1 transmission line. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines1

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.7039, -105.9580

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MEJIA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MEJIA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ Santa FeGreenfieldNMSanta Fe——3.5 yrs57.3
NORTONSubstation-AdjacentNMLos Alamos County345 kV600 MW3.5 yrs57.3
MEJIASubstation-AdjacentNMSanta Fe County115 kV100 MW3.5 yrs53.0
MIGUEL LUJANSubstation-AdjacentNMSanta Fe County115 kV100 MW3.5 yrs53.0
SOUTH PACHECOSubstation-AdjacentNMSanta Fe County115 kV100 MW3.5 yrs53.0
OZ Santa FeGreenfieldNMSanta Fe——3.5 yrs52.8
BECKNERSubstation-AdjacentNMSanta Fe County115 kV100 MW3.5 yrs52.3
COLINASSubstation-AdjacentNMSanta Fe County115 kV100 MW3.5 yrs52.2

How does MEJIA compare with other substations in New Mexico?

New Mexico has 619 substation records in HIFLD, of which 387 carry a station name; the rest are unnamed tap points, risers and line ends. 248 named substations in the state are in MEJIA's 115–229 kV band (64% of named stations). 34 sit in a higher band. 24 named substations in New Mexico operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 115 kV.

How do candidate sites near MEJIA score?

The 8 highest-scoring candidate sites within about 25 miles range from 52 to 57 on the 0–100 DC Readiness scale. They fall in Santa Fe, Los Alamos County, Santa Fe County. The New Mexico average across 1,535 scored sites is 47.8. 445 of those New Mexico sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is MEJIA substation?

MEJIA has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so MEJIA is at the national midpoint.

How many transmission lines connect to MEJIA substation?

1 transmission line terminate at or pass through MEJIA in the HIFLD line data.

Where is MEJIA substation located?

MEJIA is in New Mexico at 35.7039, -105.9580. The datacenter candidate sites closest to it are in Santa Fe, Los Alamos County, Santa Fe County.

Are there datacenter candidate sites near MEJIA substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of MEJIA. The highest-scoring is OZ Santa Fe at 57/100. Across New Mexico, the average DC Readiness score is 47.8.

Other 115 kV substations in New Mexico

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “MEJIA substation, New Mexico”, https://gridcensus.com/substations/new-mexico/mejia-bf379ad7 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for MEJIA substation, New Mexico is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.