KIRTLAND

Substation

New Mexico

Max voltage
115
kV

At a glance

KIRTLAND is a 115 kV electric substation in New Mexico, recorded in the HIFLD transmission dataset. 0 transmission lines connect to it. 34 of New Mexico's 387 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is Emcore Eubank Landfill in Bernalillo, with a DC Readiness score of 63/100.

KIRTLAND is an electric transmission substation in New Mexico. It is classified as sub-transmission (115 kv) and connects 0 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines0

Ownership

No owner is recorded for the lines that connect here.

Coordinates35.0513, -106.5343

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of KIRTLAND, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near KIRTLAND substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Emcore Eubank LandfillBrownfieldNMBernalillo115 kV2 MW3.5 yrs62.9
SANDIASubstation-AdjacentNMBernalillo County345 kV600 MW3.5 yrs61.7
WEST MESASubstation-AdjacentNMBernalillo County345 kV600 MW3.5 yrs61.3
EC Near Univ New Mexico Cogen PlantGreenfieldNMBernalillo——3.5 yrs61.2
EC Near Univ New Mexico Cogen PlantGreenfieldNMBernalillo——3.5 yrs60.6
B-ASubstation-AdjacentNMBernalillo County345 kV600 MW3.5 yrs59.2
OZ BernalilloGreenfieldNMBernalillo——3.5 yrs58.5
RIO PUERCOSubstation-AdjacentNMBernalillo County345 kV600 MW3.5 yrs57.8

How does KIRTLAND compare with other substations in New Mexico?

New Mexico has 619 substation records in HIFLD, of which 387 carry a station name; the rest are unnamed tap points, risers and line ends. 248 named substations in the state are in KIRTLAND's 115–229 kV band (64% of named stations). 34 sit in a higher band. 24 named substations in New Mexico operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 115 kV.

How do candidate sites near KIRTLAND score?

The 8 highest-scoring candidate sites within about 25 miles range from 58 to 63 on the 0–100 DC Readiness scale. They fall in Bernalillo, Bernalillo County. The New Mexico average across 1,535 scored sites is 47.8. 445 of those New Mexico sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is KIRTLAND substation?

KIRTLAND has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so KIRTLAND is at the national midpoint.

How many transmission lines connect to KIRTLAND substation?

0 transmission lines terminate at or pass through KIRTLAND in the HIFLD line data.

Where is KIRTLAND substation located?

KIRTLAND is in New Mexico at 35.0513, -106.5343. The datacenter candidate sites closest to it are in Bernalillo, Bernalillo County.

Are there datacenter candidate sites near KIRTLAND substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of KIRTLAND. The highest-scoring is Emcore Eubank Landfill at 63/100. Across New Mexico, the average DC Readiness score is 47.8.

Other 115 kV substations in New Mexico

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “KIRTLAND substation, New Mexico”, https://gridcensus.com/substations/new-mexico/kirtland-565a8faf (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for KIRTLAND substation, New Mexico is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.