DONA ANA
SubstationNew Mexico · EL PASO ELECTRIC POWER COMPANY
At a glance
DONA ANA is an electric transmission substation in New Mexico, on EL PASO ELECTRIC POWER COMPANY's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #305345 | 115 kV | — | IN SERVICE | 65.2 mi |
| #306791 | 115 kV | EL PASO ELECTRIC POWER COMPANY | IN SERVICE | 1.2 mi |
| #311418 | 115 kV | EL PASO ELECTRIC POWER COMPANY | IN SERVICE | 2.3 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of DONA ANA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| NEWMAN | Substation-Adjacent | TX | El Paso County | 345 kV | 600 MW | 3.5 yrs | 62.6 |
| BLM Solar DLA: Afton | Greenfield | NM | Doña Ana County | — | 5,000 MW | 3.5 yrs | 60.4 |
| AFTON | Substation-Adjacent | NM | Doña Ana County | 345 kV | 600 MW | 3.5 yrs | 60.0 |
| ARROYO | Substation-Adjacent | NM | Doña Ana County | 345 kV | 600 MW | 3.5 yrs | 59.5 |
| OZ Doña Ana | Greenfield | NM | Doña Ana | — | — | 3.5 yrs | 59.4 |
| OZ El Paso | Greenfield | TX | El Paso | — | — | 3.5 yrs | 59.1 |
| BORDER STEEL | Substation-Adjacent | TX | El Paso County | 115 kV | 100 MW | 3.5 yrs | 56.3 |
| EC Near Afton Generating Station | Greenfield | NM | Doña Ana | — | — | 3.5 yrs | 56.2 |
How does DONA ANA compare with other substations in New Mexico?
New Mexico has 619 substation records in HIFLD, of which 387 carry a station name; the rest are unnamed tap points, risers and line ends. 248 named substations in the state are in DONA ANA's 115–229 kV band (64% of named stations). 34 sit in a higher band. 24 named substations in New Mexico operate at 345 kV or above. The highest voltage recorded in the state is 500 kV, and the state median is 115 kV.
Who owns the transmission lines at DONA ANA?
The 3 connected lines listed above are owned by EL PASO ELECTRIC POWER COMPANY. Line voltages range from 115 kV to 115 kV. Their combined recorded length is about 68.7 miles.
How do candidate sites near DONA ANA score?
The 8 highest-scoring candidate sites within about 25 miles range from 56 to 63 on the 0–100 DC Readiness scale. They fall in El Paso County, Doña Ana County, Doña Ana, El Paso. The New Mexico average across 1,535 scored sites is 47.8. 445 of those New Mexico sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is DONA ANA substation?
DONA ANA has a maximum voltage of 115 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so DONA ANA is at the national midpoint.
How many transmission lines connect to DONA ANA substation?
3 transmission lines terminate at or pass through DONA ANA in the HIFLD line data. The connected lines listed here run at 115 kV. Together the listed lines cover about 68.7 miles.
Who owns DONA ANA substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at DONA ANA belong to EL PASO ELECTRIC POWER COMPANY. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is DONA ANA substation located?
DONA ANA is in New Mexico at 32.3420, -106.7790. The datacenter candidate sites closest to it are in El Paso County, Doña Ana County, Doña Ana.
Are there datacenter candidate sites near DONA ANA substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of DONA ANA. The highest-scoring is NEWMAN at 63/100. Across New Mexico, the average DC Readiness score is 47.8.
Other 115 kV substations in New Mexico
- RIO GRANDE· 11 lines
- CURRY COUNTY· 9 lines
- REEVES· 9 lines
- SPRINGER· 8 lines
- ZIA· 8 lines
- HERNANDEZ· 7 lines
- ALGODONES· 6 lines
- ANTHONY· 5 lines
- All named substations in New Mexico· 387 stations
- Datacenter candidate sites in New Mexico· 1,535 sites
- Brownfield and retired plant sites in New Mexico
- Substations by state
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “DONA ANA substation, New Mexico”, https://gridcensus.com/substations/new-mexico/dona-ana-5e63fe71 (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for DONA ANA substation, New Mexico is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.