Skip to content
Gridcensus

ATOKA

Substation

New Mexico

Max voltage
115
kV

ATOKA is an electric transmission substation in New Mexico. It is classified as sub-transmission (115 kv) and connects 0 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines0

Ownership & operation

Operator not catalogued for this substation.

Coordinates32.7404, -104.4121

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of ATOKA, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near ATOKA substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
UNKNOWN307140Substation-AdjacentNMEddy County345 kV600 MW4.3 yrs58.2
EDDY AC-DC-AC TIESubstation-AdjacentNMEddy County345 kV600 MW4.3 yrs57.6
UNKNOWN306969Substation-AdjacentNMEddy County230 kV300 MW4.3 yrs56.5
UNKNOWN305514Substation-AdjacentNMEddy County230 kV300 MW4.3 yrs56.0
EC Near CarlsbadGreenfieldNMEddy——4.3 yrs55.5
EC Near CarlsbadGreenfieldNMEddy——4.3 yrs55.4
EC Near CarlsbadGreenfieldNMEddy——4.3 yrs54.9
EC FFE Eddy CountyGreenfieldNMEddy County——4.3 yrs54.7

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for ATOKA substation, New Mexico is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.